【24h】

Determining Manager's Load Control Span by Modeling Management as a Service Activity

机译:通过将管理建模为服务活动来确定经理的负载和控制范围

获取原文
获取原文并翻译 | 示例

摘要

This paper shows how a production foreman and line managers can be modeled as giving variety of services. The model is essentially a queueing model with arrivals, waiting time and service. The model is first analyzed in the most general way finding the mean values of waiting times and queue length. Different management environment may have very different requirements. Our proposed model gives a good modeling solution to a variety of management styles and environments. Then, a simpler model for the control span of an assembly line foreman is developed and illustrated using a numerical example.
机译:本文展示了如何将生产领班和生产线经理建模为提供各种服务。该模型本质上是具有到达,等待时间和服务的排队模型。首先以最通用的方式分析模型,以找到等待时间和队列长度的平均值。不同的管理环境可能有非常不同的要求。我们提出的模型为各种管理样式和环境提供了很好的建模解决方案。然后,使用数字示例开发并说明了用于装配线工头控制范围的更简单模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号