The paper presents fuzzy tool for determination of cost overrun of a river type hydro power plant. The factors responsible for cost overrun have been selected from the survey conducted with the experts having experience in similar field. Hydro power plants have complicated structures lead to long running construction period, involves large amount of investment and hence are usually exposed to cost and schedule overruns risk. Cost overrun in a hydro power plant ultimately leads to increase in generation cost of electricity. Cost of electricity matters even if it is a green energy because of limited financial resources available in developing countries. The proposed cost overrun probability determination tool will help investors in making decision under uncertainty.
机译:本文提出了一种模糊工具,用于确定河流型水力发电厂的成本超支。从与类似领域有经验的专家一起进行的调查中选择了造成成本超支的因素。水力发电厂结构复杂,导致建设周期长,涉及大量投资,因此通常面临成本和进度超支的风险。水力发电厂的成本超支最终导致发电成本的增加。即使是绿色能源,电力成本也很重要,因为发展中国家可用的财政资源有限。提议的成本超支概率确定工具将帮助投资者在不确定性下做出决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号