Modified Fuzzy Group Decision-Making Approach to Cost Overrun Risk Assessment of Power Plant Projects

机译:电厂项目造价超支风险评估的改进模糊群决策方法

获取原文
获取原文并翻译 | 示例
           

摘要

Cost overrun risk assessment in the preliminary stages of a power plant project is laden with subjectivity, uncertainty, imprecision, and the vagueness of expert judgment. Current fuzzy approaches to risk assessment in such projects specifically require improvements in the reliability and aggregation process of experts' judgments as well as the incorporation of project phase-based risk assessment to comprehend the sources of the risks and their corresponding effects on cost overruns. In response, this study proposes a modified fuzzy group decision-making approach (FGDMA) and assesses cost overrun risks considering different project phases [(1)design and procurement, and (2)construction and commissioning] of the power plant projects of varying types, sizes/capacities, and contracts. The proposed methodology is applied to 10 different project scenarios to better understand the context of project risks and their profile and identify the critical cost overrun risks involved. This study will aid the comprehensive assessment of risks and increase the accuracy of project budgeting and contingency allocation decisions.
机译:电厂项目初期的成本超支风险评估充满了主观性,不确定性,不精确性和专家判断的模糊性。在此类项目中,当前的模糊风险评估方法特别需要改进专家判断的可靠性和汇总过程,并纳入基于项目阶段的风险评估,以理解风险的来源及其对成本超支的相应影响。作为回应,本研究提出了一种改进的模糊组决策方法(FGDMA),并考虑了不同类型的电厂项目的不同项目阶段[(1)设计和采购以及(2)建设和调试],评估了成本超支风险。 ,大小/容量和合同。拟议的方法适用于10个不同的项目方案,以更好地了解项目风险的背景及其概况,并确定涉及的关键成本超支风险。这项研究将有助于全面评估风险,并提高项目预算和应急分配决定的准确性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号