Modified Fuzzy Group Decision-Making Approach to Cost Overrun Risk Assessment of Power Plant Projects

机译:改进的模糊集团决策方法,以耗尽电厂项目的成本超支风险评估

获取原文
获取原文并翻译 | 示例
           

摘要

Cost overrun risk assessment in the preliminary stages of a power plant project is laden with subjectivity, uncertainty, imprecision, and the vagueness of expert judgment. Current fuzzy approaches to risk assessment in such projects specifically require improvements in the reliability and aggregation process of experts' judgments as well as the incorporation of project phase-based risk assessment to comprehend the sources of the risks and their corresponding effects on cost overruns. In response, this study proposes a modified fuzzy group decision-making approach (FGDMA) and assesses cost overrun risks considering different project phases [(1)design and procurement, and (2)construction and commissioning] of the power plant projects of varying types, sizes/capacities, and contracts. The proposed methodology is applied to 10 different project scenarios to better understand the context of project risks and their profile and identify the critical cost overrun risks involved. This study will aid the comprehensive assessment of risks and increase the accuracy of project budgeting and contingency allocation decisions.
机译:在发电厂项目的初步阶段的成本超额风险评估是具有主观性,不确定性,不精确和专家判断的模糊性。目前在这些项目中风险评估的模糊方法特别需要改善专家判决的可靠性和聚合过程,以及将项目阶段的风险评估纳入,以了解风险的来源及其对成本超支的相应影响。作为回应,本研究提出了一种改进的模糊组决策方法(FGDMA),并评估考虑不同的项目阶段的成本超额风险[(1)设计和采购,(2)建筑和调试]不同类型的电厂项目,大小/容量和合同。所提出的方法应用于10个不同的项目场景,以更好地了解项目风险及其个人资料的背景,并确定所涉及的关键成本超值风险。本研究将有助于全面评估风险,并提高项目预算和应急分配决策的准确性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号