首页> 外文会议>2007 SPE Digital Energy Conference and Exhibition >Deployment of Advanced Collaborative Environments at Scale in the North Sea Operations
【24h】

Deployment of Advanced Collaborative Environments at Scale in the North Sea Operations

机译:在北海作业中大规模部署高级协作环境

获取原文
获取原文并翻译 | 示例

摘要

As part of its global FIELD OF THE FUTURE initiative, BP in the North Sea has embarked on a programme to significantly change how onshore and offshore staff interact and collaborate, with the objective of improving the efficiency of drilling and operations. This paper reports on the first phase of this project, in which five Advanced Collaborative Environments (ACEs) have been designed and deployed in the BP Aberdeen office in support of production operations. These environments take advantage of a range of digital technologies to deliver operational data to a wider team who are focused on further improving operational excellence. The second phase of this programme involves the deployment of ACEs into all remaining North Sea assets as BP moves into its new offices in Aberdeen in late 2007 / early 2008. The paper describes the following; ?The extensive consultation with the operational staff involved onshore and offshore to ensure that the new systems delivered meaningful support to the offshore operations ?The steps taken to ensure complete 搊wnership?of the new way of working, for both onshore and offshore teams ?A review of the business benefits anticipated and/or achieved by this deployment ?The integrated hardware and software technologies deployed to deliver offshore data to an onshore support environment in real time ?The thinking behind the physical configuration of the onshore and offshore working environment ?The plans for the second phase of the project, in which further ACEs will be deployed across all BP抯 North Sea producing assets. This deployment will be the subject of a subsequent paper
机译:作为其全球未来领域计划的一部分,BP在北海的一项计划已经启动,该计划将显着改变陆上和海上员工的互动和协作方式,以提高钻井和作业效率。本文报告了该项目的第一阶段,其中在BP Aberdeen办公室设计并部署了五个高级协作环境(ACE),以支持生产运营。这些环境利用了一系列数字技术的优势,将运营数据传递给更广泛的团队,这些团队致力于进一步提高运营卓越性。该计划的第二阶段涉及在BP于2007年末/ 2008年初迁入位于阿伯丁的新办事处时,将ACEs部署到北海所有剩余资产中。与陆上和海上作业人员进行广泛协商,以确保新系统为海上作业提供有意义的支持。为确保陆上和海上团队新工作方式的完全“所有权”而采取的步骤。审查此部署预期和/或实现的业务收益?已部署集成的硬件和软件技术,以将离岸数据实时传送到岸上支持环境中;对岸上和离岸工作环境的物理配置背后的思考;计划在该项目的第二阶段,将在BP Sea北海的所有生产资产中部署更多的ACE。此部署将是后续论文的主题

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号