首页> 外文会议>Society of Petroleum Engineers Digital Energy Conference and Exhibition >Deployment of Advanced Collaborative Environments at Scale in the North Sea Operations
【24h】

Deployment of Advanced Collaborative Environments at Scale in the North Sea Operations

机译:北海业务规模的高级协同环境部署

获取原文

摘要

As part of its global FIELD OF THE FUTURE initiative, BP in the North Sea has embarked on a programme to significantly change how onshore and offshore staff interact and collaborate, with the objective of improving the efficiency of drilling and operations. This paper reports on the first phase of this project, in which five Advanced Collaborative Environments (ACEs) have been designed and deployed in the BP Aberdeen office in support of production operations. These environments take advantage of a range of digital technologies to deliver operational data to a wider team who are focused on further improving operational excellence. The second phase of this programme involves the deployment of ACEs into all remaining North Sea assets as BP moves into its new offices in Aberdeen in late 2007 / early 2008. The paper describes the following; 1. The extensive consultation with the operational staff involved onshore and offshore to ensure that the new systems delivered meaningful support to the offshore operations 2. The steps taken to ensure complete “ownership” of the new way of working, for both onshore and offshore teams 3. A review of the business benefits anticipated and/or achieved by this deployment 4. The integrated hardware and software technologies deployed to deliver offshore data to an onshore support environment in real time5. The thinking behind the physical configuration of the onshore and offshore working environment 6. The plans for the second phase of the project, in which further ACEs will be deployed across all BP’s North Sea producing assets. This deployment will be the subject of a subsequent paper.
机译:作为其未来倡议的全球领域的一部分,北海的BP已经开始对陆上和离岸员工的互动和合作方式进行了大大改变的计划,以提高钻井和运营效率。本文报告了该项目的第一阶段,其中五个先进的协作环境(ACE)已经在BP Aberdeen Office中设计和部署,以支持生产运营。这些环境利用了一系列数字技术,以将运营数据提供给专注于进一步提高运营卓越的更广泛的团队。该计划的第二阶段涉及将ACES部署到所有剩余的北海资产,因为BP迁入2008年底2008年初的Aberdeen的新办事处。本文描述了以下内容; 1.与运营人员进行广泛的磋商,涉及陆上和海上,以确保新系统对离岸行动提供有意义的支持2.为陆上和离岸团队确保完整的“所有权”所采取的措施。 3.通过此部署预期和/或实现的业务福利述评。部署的集成硬件和软件技术将在实时将海上数据提供给陆上支持环境。陆上和海上工作环境的物理配置背后的思考。项目第二阶段的计划,其中进一步的ACE将在所有BP的北海生产资产中部署。此部署将是后续纸张的主题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号