首页>
外国专利>
PREDICTIVE PLANNING IN A MICRONETWORK USING HIGH LOAD TIME WINDOWS OF A MAIN POWER NETWORK
PREDICTIVE PLANNING IN A MICRONETWORK USING HIGH LOAD TIME WINDOWS OF A MAIN POWER NETWORK
展开▼
机译:基于主电网高负荷时间窗的微网预测规划
展开▼
页面导航
摘要
著录项
相似文献
摘要
A target function is optimized in the predictive operational planning in a microgrid with a connection to a main electricity grid. The target function takes into account a power draw of the microgrid from the main electricity grid in at least one high-load time window of the main electricity grid.
展开▼