首页> 中文会议>Power and Energy Engineering Conference 2010(PEEC2010)(2010年电力与能源工程学术会议) >Optimization Model of Purchasing Interruptible Load for Network Congestion Constrained Dispatch during the Peak Load Periods

Optimization Model of Purchasing Interruptible Load for Network Congestion Constrained Dispatch during the Peak Load Periods

摘要

Interruptible load management (ILM) is one of the demand response incentives. It’s good to the reliability of the power system. During the peak time of the power system,there are always network congestion constraints. In this paper,based on the active power dispatch an optimal IL purchasing model including hybrid generation,network and demand side constraints is presented. This model not only puts emphasis on the network congestion capacity constraint but considering the influence of pre-informed time and the interruption duration period and the geographical position on network loss. The Binary version of the Particle Swarm Optimization (BPSO) method is used to solve this model. And the simulation result shows that the model is fit for using IL in peak load congestion constrained dispatch in developing power market.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号