CONSTRUCTION METHOD FOR INNER STRUCTURE OF SINGLE-BORE DOUBLE-TRACK COMPOSITE LINING SHIELD TUNNEL

机译:单孔双轨复合衬砌罩隧道内部结构的施工方法

摘要

The present invention relates to the field of shield tunnel construction, and provides a construction method for an inner structure of a single-bore double-track composite lining shield tunnel. The method mainly include: a first stage and a second stage; in the first stage, composite lining construction is conducted on a middle section and/or a rear section of the tunnel synchronously during tunnel boring, and lining is conducted on the tunnel by adopting an order of first lining and then splitting from bottom to top in the composite lining construction; and the second stage is a construction stage after the tunnel is bored through. With the adoption of the construction method, the construction of the inner lining structure is conducted on the middle section and/or the rear section of the tunnel synchronously during shield tunnel boring, and thus the construction efficiency is improved; moreover, the order of first lining and then splitting from bottom to top is generally adopted in the composite lining construction, and thus, the stability of the interior of the tunnel can be guaranteed, and smooth passing in a construction space is also guaranteed. The construction method provided by the present invention has good practicability.
机译:本发明涉及屏蔽隧道结构领域,为单孔双轨复合衬砌罩隧道的内部结构提供了一种结构方法。该方法主要包括:第一阶段和第二阶段;在第一阶段,复合衬里结构在隧道钻孔期间同步地在隧道的中间部分和/或隧道后部进行,并且通过采用第一衬里的顺序然后从底部分裂到隧道上进行衬里复合衬砌结构;并且第二阶段是隧道钻孔后的施工阶段。随着施工方法的采用,在屏蔽隧道钻孔期间,在隧道的中间部分和/或隧道的后部进行内衬结构的结构,因此改善了结构效率;此外,在复合衬砌结构中通常采用第一衬砌然后从底部分裂的顺序,因此,可以保证隧道内部的稳定性,并且还可以保证施工空间的平滑通过。本发明提供的施工方法具有良好的实用性。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号