首页> 外国专利> Procedure for the construction of highly represented concrete slabs through the use of lost formwork (Machine-translation by Google Translate, not legally binding)

Procedure for the construction of highly represented concrete slabs through the use of lost formwork (Machine-translation by Google Translate, not legally binding)

机译:通过使用丢失的模板来构造高代表性混凝土板的步骤(由Google Translate进行机器翻译,不具有法律约束力)

摘要

PROCEDURE FOR CONSTRUCTION OF ARMED CONCRETE SLABS OF GREAT STRUCTURE THROUGH THE USE OF LOST WRAPS, essentially characterized by having a supporting armature, formed by a structure of bearing irons and partition plates, to which are fixed lost formworks that allow vibration of the concreting and support the weight of the workers who deal with it, the formwork being cylindrical, hollow and lightweight elements, closed at each end by a cover, made of steel sheet reinforced by ribs with a spirally sewn seam, and verifying the concreting once the formwork has been fastened to the armor. (Machine-translation by Google Translate, not legally binding)
机译:通过使用废纸W来建造大型结构的武装混凝土楼板的步骤,其主要特征是具有支撑电枢,该支撑电枢由轴承铁和隔板的结构形成,固定有丢失的模板,从而使混凝土和支撑物产生振动负责处理它的工人的重量,该模板为圆柱形,空心且轻巧的元件,两端均由盖封闭,由钢板制成,该钢板由带有螺旋缝的肋骨加固,并且一旦模板制成,便会验证混凝土固定在装甲上。 (通过Google翻译进行机器翻译,没有法律约束力)

著录项

  • 公开/公告号ES301777A3

    专利类型

  • 公开/公告日1964-09-16

    原文格式PDF

  • 申请/专利权人 ORBEA MUGUIRO ANTONIO;

    申请/专利号ES19640301777

  • 发明设计人

    申请日1964-07-07

  • 分类号

  • 国家 ES

  • 入库时间 2022-08-23 16:44:00

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号