首页>
外国专利>
A SUBMERGED TUNNEL AND A METHOD OF, AND MEANS FOR, CONSTRUCTING A SUBMERGED TUNNEL
A SUBMERGED TUNNEL AND A METHOD OF, AND MEANS FOR, CONSTRUCTING A SUBMERGED TUNNEL
展开▼
机译:潜水隧道以及构造潜水隧道的方法和手段
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method of, and apparatus for, constructing a submerged tunnel in situ and a submerged tunnel formed thereby has an inverted arch formation to resist upward buoyancy thrust and a sealed chamber unit mounted on the tunnel and longitudinally displaceable along it for servicing the exterior of the tunnel. The tunnel is constructed in situ by progressively lengthening towards each other two tunnel sections (3, 3 min ), which extend in cantilevered manner from opposed base foundations (1 and 2). Each tunnel section has mounted on the free end thereof of an outer chamber unit (13, 13 min ) and an inner chamber unit (6, 6 min ) within the latter of which the free end of the tunnel section is progressively formed and extended. As the tunnel sections (3, 3 min ) are lengthened their associated chamber units (6, 6 min , 13, 13 min ) are displaced longitudinally and sequentially to provide clearance for further lengthening, such displacement may be effected by hydraulic rams (20) or mechanical rack and pinion devices (19) When the tunnel sections 3, 3 min are sufficiently lengthened the outer chamber units (13, 13 min ) dock and are sealed together at 28, 28 min and a passage opened between those chamber units (13, 13 min ). The inner chamber units (6, 6 min ) are removed from within the combined outer chamber units (13, 13 min ) and a passage is opened between these latter units through which the tunnel sections are extended and connected together to form the continuous tubular tunnel. The submerged depth of the tunnel sections may be controlled during construction by winches and anchorages devices (25, 26 and 27).
展开▼