首页>
外国专利>
CONSTRUCTION OF WATER-IMPERMEABLE LAYER UNDER EXISTING DUMPING GROUND, AND TUNNELING SHIELD
CONSTRUCTION OF WATER-IMPERMEABLE LAYER UNDER EXISTING DUMPING GROUND, AND TUNNELING SHIELD
展开▼
机译:既有倾覆地面下的不透水层的施工及隧道盾构
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: To make an impermeably layer easily inspectable and repairable by boring many parallel tunnels in an adjoining state by means of a tunnel boring shield machine and forming the external walls of the tunnels of inner pipes and external layers packed with a mineral sealant. CONSTITUTION: Many parallel tunnels are bored in an adjoining state below a dumping area, etc., by using a tunnel boring shield machine. At the time of boring the tunnels, inner pipes 2 composed of steel pipes, polyethylene pipes, etc., are arranged behind the shield machine. Then the annular spaces between the inner pipes 2 and the external walls behind the shield machine are filled up with a mineral sealant 29 composed of viscous earth, bentonite-containing sandy earth, etc. In addition, an impermeable layer is formed composed of a lining element 1 by compacting the sealant with the advancing reaction of the shield machine. Moreover, the groundwater level is lowered by providing perforated rances 4 and, when required, the insides of the pipes 2 are alternately filled up with a sealant 3. Therefore, the sealing effects of the impermeably layer can be inspected and repaired any time. Since the rances 3 are provided, in addition, the cleaning water of the dumping area can be collected and the sealing effect of the impermeably layer can be improved by lowering the groundwater level.
展开▼