首页> 外国专利> Base construction of a foundation ditch in pressing ground water comprises a sealing base consisting of a natural water-impermeable layer or an artificial water-impermeable layer as the sealing component

Base construction of a foundation ditch in pressing ground water comprises a sealing base consisting of a natural water-impermeable layer or an artificial water-impermeable layer as the sealing component

机译:压制地下水中的基础沟的基础结构包括密封基础,该密封基础由天然的不透水层或人造的不透水层作为密封成分

摘要

Base construction of a foundation ditch in pressing ground water comprises at least one sealing base (1) consisting of a natural water-impermeable layer or an artificial water-impermeable layer as the sealing component. Grown soil (3) lies above the sealing base and below the foundation base (8). A layer (4) artificially manufactured by changing the grown soil and having a greater water-permeability than the gown soil lies above the sealing base and below the foundation base. Preferred Features: The water-impermeable layer is approximately 0.05-0.5 meters thick.
机译:在压入地下水中的基础沟的基础结构包括至少一个密封基础(1),其由天然的不透水层或人造的不透水层作为密封成分。生长的土壤(3)位于密封底座上方,位于基础底座(8)下方。通过改变生长的土壤并具有比长袍土壤更大的水渗透性而人工制造的层(4)位于密封基础之上和基础基础之下。优选特征:不透水层约0.05-0.5米厚。

著录项

  • 公开/公告号DE10140300A1

    专利类型

  • 公开/公告日2003-02-27

    原文格式PDF

  • 申请/专利权人 ED. ZUEBLIN AG;

    申请/专利号DE2001140300

  • 发明设计人 BROSIG STEFAN;

    申请日2001-08-16

  • 分类号E02D19/00;

  • 国家 DE

  • 入库时间 2022-08-21 23:42:45

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号