首页> 外国专利> FINISH WORK EXECUTING METHOD FOR RISER DEVICE, BEARING DEVICE, BEARING STAND DEVICE, AND CONCRETE STAIRWAY, TO BE USED FOR FINISH WORK EXECUTION FOR CONCRETE STAIRS

FINISH WORK EXECUTING METHOD FOR RISER DEVICE, BEARING DEVICE, BEARING STAND DEVICE, AND CONCRETE STAIRWAY, TO BE USED FOR FINISH WORK EXECUTION FOR CONCRETE STAIRS

机译:用于竖井设备,承重设备,支座设备和混凝土楼梯的完工执行方法,用于混凝土楼梯的完工执行

摘要

PURPOSE:To enable the work of concrete stairway with high precision, to be executed by executing the finish work of the concrete stairway easily and quickly, even without skillful workers, and by regulating the positions of risers to be the riser sections of the concrete stairway, easily fixed. CONSTITUTION:On the front side of the stepped sections of roughly constructed concrete stairway 4, via a bearing device 2, a riser 10 is set at a required distance, and a void section is formed between the front face 41 of the stepped section and the riser 10, so that the upper side section 13 of the riser 10 may be made higher than the upper face 42 of the stepped section by a required level. Then, on the upper face 42 of the stepped section, mortar is placed, and the void section is filled up with the mortar, and on the upper face 42, a tread is formed, and the surface 100 of the riser 10 is set as a riser face, and the stairway is constructed.
机译:目的:为了使混凝土楼梯的工作精度很高,即使没有熟练的工人,也可以轻松,快速地执行混凝土楼梯的完工工作,并通过调节立管的位置作为混凝土楼梯的立管部分来执行,很容易修复。构成:在粗略构造的混凝土楼梯4的台阶部分的前侧,通过轴承装置2,将立管10设置在所需的距离处,并且在台阶部分的前表面41和壁之间形成空隙部分。提升器10,使得提升器10的上侧部分13可以比阶梯部分的上表面42高出所需的高度。然后,在台阶部分的上表面42上放置灰浆,并且在空隙部分中填充灰浆,并且在上表面42上形成胎面,并且立管10的表面100被设置为立管面,并建造楼梯。

著录项

  • 公开/公告号JPH05209452A

    专利类型

  • 公开/公告日1993-08-20

    原文格式PDF

  • 申请/专利权人 TSURUTA YASUYUKI;

    申请/专利号JP19920042302

  • 发明设计人 TSURUTA YASUYUKI;

    申请日1992-01-30

  • 分类号E04F11/14;E04F21/00;E04G13/06;E04G21/18;

  • 国家 JP

  • 入库时间 2022-08-22 05:19:16

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号