首页>
外国专利>
Usage and engineering works construction ones null of application stone for engineering works construction thing and application stone for engineering works construction thing
Usage and engineering works construction ones null of application stone for engineering works construction thing and application stone for engineering works construction thing
PROBLEM TO BE SOLVED: To facilitate piling up construction of natural stones and, at the same time, to make it possible to construct a stabilized and firm civil engineering structure even in the case the piling up construction of such natural stones is carried out. ;SOLUTION: The basic end section 4a of a bar-shaped member 4 is monolithically formed by a natural stone 2, and a civil engineering structure construction stone 1 providing a washer 7 to the front end section 4b of the bar-shaped member 4 is prepared. A plurality of civil engineering structure construction stones 1 are used to successively pile up a plurality of natural stones 2, at the same time, a plurality of bar-shaped members 4 are arranged in an approximately parallel direction with them, the bar-shaped members 4 and washers 7 are buried in earth and sand, etc., and high frictional force is ensured between the earth and sand, etc., 13 and washers, etc.;COPYRIGHT: (C)1999,JPO
展开▼