首页> 外国专利> Process for adapting the electric power consumption period from the distribution network of electric storage heating devices, particularly water heaters, and electronic device using this process

Process for adapting the electric power consumption period from the distribution network of electric storage heating devices, particularly water heaters, and electronic device using this process

机译:从蓄电加热设备(尤其是热水器)和电子设备的配电网络调整用电时间的方法

摘要

Electric supply to the water heater is controlled by an electronic unit using fuzzy logic to allow it to adapt to variable off-peak periods within a country, both in terms of number of periods and actual times. The off-peak periods are automatically detected, and the temperature gradient determined as a basis for determining optimum connection times.
机译:热水器的供电由电子单元控制,该电子单元使用模糊逻辑,以使其能够适应一个国家内可变的非高峰时段,无论是时段数量还是实际时间。自动检测非高峰时段,并确定温度梯度作为确定最佳连接时间的基础。

著录项

  • 公开/公告号EP1158381A2

    专利类型

  • 公开/公告日2001-11-28

    原文格式PDF

  • 申请/专利权人 MTS TECHNICAL S.A.;

    申请/专利号EP20010112449

  • 发明设计人 XHONNEUX ALAIN;GEUTEN FRANCIS;

    申请日2001-05-22

  • 分类号G05D23/19;F24H9/20;

  • 国家 EP

  • 入库时间 2022-08-22 00:36:59

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号