首页> 外国专利> COMPOSITE FOR MANUFACTURING HIGH-STRENGTH CONCRETE POLE, HIGH-STRENGTH CONCRETE POLE AND MANUFACTURING METHOD FOR REDUCING STOPPAGE OF POWER SUPPLY AND LEAKAGE OF ELECTRICITY

COMPOSITE FOR MANUFACTURING HIGH-STRENGTH CONCRETE POLE, HIGH-STRENGTH CONCRETE POLE AND MANUFACTURING METHOD FOR REDUCING STOPPAGE OF POWER SUPPLY AND LEAKAGE OF ELECTRICITY

机译:制造高强度混凝土极的复合物,高强度混凝土极和减少电源的停电和漏电的制造方法

摘要

PURPOSE: A high-strength concrete pole is provided to prevent the stoppage of power supply and the leakage of electricity caused by the breakdown of a pole by securing enough durability against an external impact, a car crash, etc. CONSTITUTION: The high-strength concrete pole has a hollow inside and a concrete body of the pole is composed of a tip end part(13) buried under the ground and a front end part(15) opposite to the tip end part(13), and the tip end part(13) is formed to have the larger outer diameter than the front end part(15) and in a cylindrical structure having a slow gradient. A tension bar, a primary reinforcement bar, a tension bar and a secondary reinforcement bar are arranged on the concrete body of the pole in order.
机译:目的:提供高强度混凝土杆,以通过确保足够的耐外部冲击,车祸等耐久性来防止停电和因杆故障而导致的漏电。组成:高强度混凝土杆的内部为中空,杆的混凝土主体由埋在地下的顶端部(13)和与该顶端部(13)相对的顶端部(15)构成。 (13)形成为具有比前端部(15)大的外径,并且为具有缓慢的梯度的圆柱结构。在杆的混凝土主体上依次布置有拉力杆,主钢筋,拉力杆和副钢筋。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号