首页>
外国专利>
METHOD OF WORKING CONNECTION END OF DEFORMED BAR FOR REINFORCING CONCRETE, DEFORMED BAR WORKED BY THE METHOD AND STRUCTURE OF CONNECTING DEFORMED BAR
METHOD OF WORKING CONNECTION END OF DEFORMED BAR FOR REINFORCING CONCRETE, DEFORMED BAR WORKED BY THE METHOD AND STRUCTURE OF CONNECTING DEFORMED BAR
展开▼
机译:钢筋混凝土变形钢筋连接端的工作方法,变形钢筋的连接方法及结构
展开▼
页面导航
摘要
著录项
相似文献
摘要
With an object of providing a method of working a connection end portion ofdeformed bar for reinforcing concrete considerably reducing working expense byenhancing easiness of working by promoting mechanical strength of a connection portionby being able to work the connection portion without destructing a steel skeletonstructure of a connection portion between pieces of steel bar, deformed bar worked bythe method and a connection structure of deformed bar, the invention provides a methodof working a connection end portion of deformed bar for reinforcing concrete featured incomprising a swaging step in which in deformed bar for reinforcing concrete featured inswaging at least a connection end portion at normal temperature and forming a rolledthread portion at an outer peripheral face of the connection end portion of the deformedbar subjected to the swaging step in which at least one connection end portion is swagedat a normal temperature such that a maximum diameter of the connection end portion isequal to or slightly larger than a diameter of a cylindrical body of the deformed bar orslightly smaller than a diameter of the deformed bar depending on a degree of working;anda rolling step of forming a thread portion having a diameter substantially equal toa swaging diameter at an outer peripheral face of the connection end portion of thedeformed bar which has been subjected to the swaging step.
展开▼