首页> 外国专利> APPARATUS FOR FABRICATING INLINE INTEGRATED CIRCUIT CHIP PACKAGE FOR PACKAGING DUAL-SIDED STACK MULTI CHIP AND METHOD FOR FABRICATING INTEGRATED CIRCUIT CHIP PACKAGE USING THE SAME TO REDUCE NUMBER OF MANUAL PROCESSES AND SIMPLIFY PROCESS

APPARATUS FOR FABRICATING INLINE INTEGRATED CIRCUIT CHIP PACKAGE FOR PACKAGING DUAL-SIDED STACK MULTI CHIP AND METHOD FOR FABRICATING INTEGRATED CIRCUIT CHIP PACKAGE USING THE SAME TO REDUCE NUMBER OF MANUAL PROCESSES AND SIMPLIFY PROCESS

机译:用于包装用于双侧堆叠多芯片的在线集成芯片封装的设备和用于使用相同的设备来减少手动过程和简化过程的集成芯片封装的方法

摘要

PURPOSE: An apparatus for fabricating an inline integrated circuit chip package for packaging a dual-sided stack multi chip is provided to reduce the number of manual processes and shorten an interval of TFT(turn around time) by simplifying a double-sided stack multi chip packaging process. CONSTITUTION: A loader part(110) supplies a leadframe from a magazine receiving the leadframe having the first surface and the second surface opposite to the first surface wherein the first surface of the leadframe faces upward. The first package fabricating apparatus(120) performs a process for mounting the first semiconductor chip on the first surface of the leadframe supplied from the loader part. The second package fabricating apparatus(130) performs a process for mounting the second semiconductor chip on the second surface of the leadframe. A buffer(140) includes an inversion unit(150) for inverting the leadframe to make the second surface face upward before the leadframe unloaded from the first package fabricating apparatus is supplied to the second package fabricating apparatus, installed between the first and second package fabricating apparatuses. An unloader part(180) makes the magazine filled with the leadframe unloaded from the second package fabricating apparatus to unload the magazine.
机译:目的:提供一种用于制造用于封装双面堆叠多芯片的在线集成电路芯片封装的设备,以通过简化双面堆叠多芯片来减少手动处理的数量并缩短TFT的间隔(周转时间)。包装过程。构成:装载器部分(110)从盒中提供引线框架,该框架接收具有第一表面和与第一表面相对的第二表面的引线框架,其中引线框架的第一表面朝上。第一封装件制造设备(120)执行用于将第一半导体芯片安装在从装载器部分提供的引线框架的第一表面上的处理。第二封装制造设备(130)执行用于将第二半导体芯片安装在引线框架的第二表面上的过程。缓冲器(140)包括反转单元(150),该反转单元(150)用于在从第一封装制造设备卸载的引线框架被供应到第二封装制造设备之前反转引线框架以使第二表面朝上,该反转单元安装在第一和第二封装制造之间。仪器。卸载器部分(180)使盒装满从第二封装制造设备卸载的引线框架,以卸载盒。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号