首页> 外国专利> Power generation facility operation planning system and power selling system

Power generation facility operation planning system and power selling system

机译:发电设施运行计划系统和电力销售系统

摘要

PROBLEM TO BE SOLVED: To determine and obtain a rational operation program system for a generation set taking into consideration the variation of a fuel cost and an influence exerted upon the Earth's environment. SOLUTION: The operation program system for the generation set reads out data on a power demand forecast, data on the generation set and data on a fuel price from a memory 10 and a communication network 1 using an operation system evaluation means 9; examines the operation system for the generation set that is operated in accordance with a power demand forecast during an operation period; calculates a generation cost per operation period; and employs an operation system that is cheapest in a generation cost during the operation period, to suppress a power selling rate to the lowest. Further, an expense borne to an environment such as an environmental tax is calculated from data obtained through the communication network based on an environmental burden discharged from each generation set, and can be reflected to the generation cost of the operation system.
机译:要解决的问题:确定并获得合理的发电机组运行程序系统,要考虑到燃料成本的变化以及对地球环境的影响。解决方案:用于发电机组的运行程序系统使用操作系统评估装置9从存储器10和通信网络1中读出与电力需求预测有关的数据,与发电机组有关的数据以及与燃料价格有关的数据;检查在运行期间根据电力需求预测运行的发电机组的操作系统;计算每个运营期的发电成本;并且采用在操作期间中发电成本最便宜的操作系统,以将电力销售率抑制到最低。此外,基于从每个发电机组释放的环境负担,从通过通信网络获得的数据中计算环境负担的费用,例如环境税,并可以反映到操作系统的发电成本中。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号