首页> 外国专利> Application manner of the bearing capacity improvement post which

Application manner of the bearing capacity improvement post which

机译:承载力提高桩的应用方式

摘要

PROBLEM TO BE SOLVED: To enhance the bearing power of a pile without increasing the length of the pile or using a special device. ;SOLUTION: An H-section 1 on which a guide pipe 3 extending to near its end is mounted is pushed into the ground by driving or vibration, and after soil in the guide pipe 3 is removed, a rod 4 is passed through the guide pipe 3. A hardener is ejected at high pressure through the rod 4 and agitated to form a consolidator at the end of a pile. After a hole for a cast-in-lace pile is bored, a reinforcing cage fitted with a plurality of guide pipes each extending to near an end is built therein, and after concrete is placed and hardened, a rod is passed through each guide pipe. A hardener is ejected at high pressure through the rods and agitated to construct a consolidator at an end portion.;COPYRIGHT: (C)1999,JPO
机译:要解决的问题:在不增加桩长或不使用特殊装置的情况下提高桩的承载力。 ;解决方案:通过驱动或振动将安装有延伸到其末端附近的导管3的H型截面1推入地面,并且在去除导管3中的污物之后,使杆4穿过导管管3。固化剂通过杆4在高压下排出,并在桩的末端进行搅拌,形成固化剂。在钻孔后,在其中钻孔,然后在加强笼中安装多个导向管,每个导向管都延伸到一端,在混凝土浇筑和硬化后,将一根杆穿过每个导向管。 。硬化剂通过棒在高压下排出,并在端部搅拌形成固化剂。;版权所有:(C)1999,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号