PROBLEM TO BE SOLVED: To improve assurance and reliability for a target assignment to each firing unit.;SOLUTION: A distributed airframe launching tube control system comprises the steps of registering a target assigning result obtained by an assignment decision processing function 121d by each firing unit with a shared information data link 122 via an approval processing function 121e, in addition to executing of processing of an assignment processing function 121c and the assignment decision processing function 121d so as to execute the target assignment of the same content for each firing unit connected to a network, and selectively obtaining a final target assignment result from the target assignment result obtained by each firing unit and the target assignment result of each firing unit already registered with the shared information data link 122 by a final decision processing function 121f in a next time.;COPYRIGHT: (C)2002,JPO
展开▼