首页> 外国专利> Culverts on roads heaving With FOUNDATION

Culverts on roads heaving With FOUNDATION

机译:地基起伏的道路上的涵洞

摘要

1.u0432u043eu0434u043eu043fu0440u043eu043fu0443u0441u043au043du0430u00a0 pipe on the road, u043fu0443u0447u0438u043du0438u0441u0442u044bu043c basis, u0432u043au043bu044eu0447u0430u044eu0449u0430u00a0 u0432u043eu0434u043eu043fu0440u043eu0432u043eu0434u00a0u0449u0438u0439 tract of precast concrete elements, u0442u0435u043fu043bu043eu0437u0430u0449u0438u0442u043du044bu0439 screen the pipes, lines and strengthening the u0431u044cu0435u0444u043eu0432, u043eu0442u043bu0438u0447u0430u044eu0449u0430u00a0u0441u00a0, u0442u0435u043fu043bu043eu0437u0430u0449u0438u0442u043du044bu0439 screen made of a high thermal resistance and load u0441u043fu043eu0441 u043eu0431u043du043eu0441u0442u044cu044e artificial material, such as styrofoamlocated directly under the pipe or the pipes or done over the protective layer and has a width not less than the width of the halo u043fu0440u043eu043cu0435u0440u0437u0430u043du0438u00a0 soil at the tube at the level of its u0440u0430u0441u043fu043eu043bu043eu0436u0435u043du0438u00a0 and the thickness u0442u0435u043fu043bu043eu0437u0430u0449u0438u0442u043du043eu0433u043e screen is equivalent to u0441u043bu043eu00a0 method, the thickness of the calculated u0441u043bu043eu00a0 u043fu0440u043eu043cu0435u0440u0437u0430u043du0438u00a0 groo u043du0442u0430 u043eu0441u043du043eu0432u0430u043du0438u00a0 pipe defined condition;dfoidfi - dufi,;where dfoi - thickness calculated u0441u043bu043eu00a0 u043fu0440u043eu043cu0435u0440u0437u0430u043du0438u00a0 soil u043eu0441u043du043eu0432u0430u043du0438u00a0 pipes (i - m section of its length, u043fu043eu0434u043bu0435u0436u0430u0449u0430u00a0 equivalent replacement (compensation), thermal shield m;;dfi - u0440u0430u0441u0447u0435u0442u043du0430u00a0 depth of seasonal u043fu0440u043eu043cu0435u0440u0437u0430u043du0438u00a0 u043eu0441u043du043eu0432u0430u043du0438u00a0 pipes in the ground, and in the absence of u0442u0435u043fu043bu043eu0437u0430u0449u0438u0442u043du043eu0433u043e screen, m;;dufi - u043fu0440u0435u0434u0435u043bu044cu043du0430u00a0 on condition of pipe soil depth u043fu0440u043eu043cu0435u0440u0437u0430u043du0438u00a0 u043eu0441u043du043eu0432u0430u043du0438u00a0 under thermal screen (i - m and the lengths of pipe (m), u043au043eu0442u043eu0440u0430u00a0 defined for u0432u0438u0441u0438u043cu043eu0441u0442u044cu044e:;where qri - u0440u0430u0441u0447u0435u0442u043du0430u00a0 power vertical u0434u0430u0432u043bu0435u043du0438u00a0 soil embankment, u0434u0435u0439u0441u0442u0432u0443u044eu0449u0430u00a0 1 engos. pipe length (determined by the reliability factor for the load (f = 0.9), kn / m;;qTi - calculated weight 1 engos. m pipes (given the weight of foundation, kn / m), a factor of reliability on the load (f = 0.9.;the estimated value of the unit normal force cold u043fu0443u0447u0435u043du0438u00a0 soil u043eu0441u043du043eu0432u0430u043du0438u00a0 pipes, kpa / m (kn / m3).;bTi - u0440u0430u0441u0447u0435u0442u043du0430u00a0 width (outer diameter) tube or the soles of her foundation, m;;c - the working conditions (0.9).;n is the ratio of (1.1).;2. on u043eu0442u043bu0438u0447u0430u044eu0449u0430u00a0u0441u00a0 u0432u043eu0434u043eu043fu0440u043eu043fu0443u0441u043au043du0430u00a0 pipe 1, so that, in the case of the calculation of the maximum permissible u0434u0435u0444u043eu0440u043cu0430u0446u0438u00a0u043c u043fu0440u0435u0434u0435u043bu044cu043du0430u00a0 depth u043fu0440u043eu043cu0435u0440u0437u0430u043du0438u00a0 soil u043eu0441u043du043eu0432u0430u043du0438u00a0 under heat the protective screen of the ufi (m) defined condition;where dufi - u043fu0440u0435u0434u0435u043bu044cu043du0430u00a0 on condition of pipes (corresponds to the beginning of u043fu0435u0440u0435u043cu0435u0449u0435u043du0438u00a0 u0441u043eu043eu0440u0443u0436u0435u043du0438u00a0 up) the depth of soil u043fu0440u043eu043cu0435u0440u0437u0430u043du0438u00a0 u043eu0441u043du043eu0432u0430u043du0438u00a0 under thermal acre an (i - m and the lengths of the pipes, m;;husi is the importance of the joint deformation (u043fu043eu0434u043du00a0u0442u0438u00a0) u043eu0441u043du043eu0432u0430u043du0438u00a0 and most manipulative element (link) the pipes under the influence of cold u043fu0443u0447u0435u043du0438 u00a0, m;;moi - weighted average module u043fu0443u0447u0435u043du0438u00a0 (the proportion of units) in the zone of u0444u043eu0440u043cu0438u0440u043eu0432u0430u043du0438u00a0 limit deformation husi established dependency.;here mi, hi, respectively u043fu0443u0447u0435u043du0438u00a0 module (the proportion of units) and the thickness (m) of i-th u0441u043bu043eu00a0 soil zone u043fu0440u043eu043cu0435u0440u0437u0430u043du0438u00a0 u043eu0441u043du043eu0432u0430u043du0438u00a0 pipes of maximum permissible deformations ( u0434u043du00a0u0442u0438u0435) husi most manipulative element (link) u0441u043eu043eu0440u0443u0436u0435u043du0438u00a0.;3. on u043eu0442u043bu0438u0447u0430u044eu0449u0430u00a0u0441u00a0 u0432u043eu0434u043eu043fu0440u043eu043fu0443u0441u043au043du0430u00a0 pipe 1, so that, in the case of the device u0442u0435u043fu043bu043eu0437u0430u0449u0438u0442u043du043eu0433u043e screen of u0432u043eu0434u043eu043fu0440u043eu043du0438u0446u0430u0435u043cu043eu0433u043e (u0433u0438u0434u0440u043eu0444u0438u043bu044cu043du043eu0433u043e) material is coated with u0433u0438u0434u0440u043eu0444u043eu0431u043du044bu043c with u043eu0441u0442u0430u0432u043eu043c, e.g. epoxy resin, or enclosed in a shell of u0433u0438u0434u0440u043eu0438u0437u043eu043bu00a0u0446u0438u043eu043du043du043eu0433u043e material, for example of plastic film.;4. u0432u043eu0434u043eu043fu0440u043eu043fu0443u0441u043au043du0430u00a0 pipe on any of the u043fu043f.1 and 2, u043eu0442u043bu0438u0447u0430u044eu0449u0430u00a0u0441u00a0, depending on the u043fu043eu043bu043eu0436u0435u043du0438u00a0 design front u043fu0440u043eu043cu0435u0440u0437u0430u043du0438u00a0, u0442u0435u043fu043bu043eu0437u0430u0449u0438u0442u043du044bu0439 screen can be executed a continuous length of pipe or u0441u043eu0441u0442u043eu00a0u0449u0438u043c two parts with their location on the input and output sections of u0432u043eu0434u043eu043fu0440u043eu0432u043eu0434u00a0u0449u0435u0433u043e tract u0441u043eu043eu0440u0443u0436u0435u043du0438u00a0.
机译:1. u0432 u043e u0434 u043e u043f u0440 u043e u043f u0443 u0441 u043a u043d u0430 u00a0道路上的管道, u043f u0443 u0447 u0447 u0438 u043d u0438 u0441 u0442 u044b u043c为基础, u0432 u043a u043b u044e u0447 u0430 u044e u0449 u0430 u00a0 u0432 u043e u0434 u043e u043f u0440 u04340 u043e u0432 u043e u0434 u0449 u0438 u0439预制混凝土元素段, u0442 u0435 u043f u043b u043e u0437 u0430 u0449 u0438 u0442 u043d u044b u0439屏蔽管道,管线并加固 u0431 u044c u0435 u0444 u043e u0432, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0430 u00a0 u0441 u00a0, u0442 u0435 u0435 u043f u043b u043e u0437 u0430 u0438 u0442 u043d u044b u0439屏幕由高热阻和负载制成 u0441 u043f u043e u0441 u043e u0431 u043d u043e u0441 u0442 u044c u044e人造材料,例如位于正下方的聚苯乙烯一根或多根管子或在保护层上做过且宽度不小于光环的宽度 u043f u0440 u043e u043c u0435 u0440 u0437 u0430 u043d u0438 u00a0在管子上的土壤处于 u0440 u0430 u0441 u043f u043e u043b u043e u0436 u0435 u043d u0438 u00a0和厚度 u0442 u0435 u043f u043b u043e u0437 u0430 u0449 u0438 u0442 u043d u043e u0433 u043e屏幕等效于 u0441 u043b u043e u00a0方法,即计算出的 u0441 u043b u043e u00a0 u043f u0440 u043e u043c u0435 u0440 u0437 u0430 u043d u04d u0438 u00a0 groo u043d u0442 u0430 u043e u0441 u043d u043e u0432 u0430 u043d u0438 u04d条件; dfoidfi-dufi ,;其中dfoi-厚度计算 u0441 u043b u043e u00a0 u043f u0440 u043e u043c u0435 u0440 u0437 u0430 u043d u0438 u00a0土壤 u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0管道(长度为i-m的部分, u043f u043e u0434 u043b u0435 u0436 u0430 u0449 u0430 u00a0等效替换件(补偿件),隔热板m ;; dfi- u0440 u0430 u0441 u0447 u0435 u0442 u043d u0430 u00a0季节性 u043f u0440 u043e u043c u0435 u0440 u的深度0437 u0430 u043d u0438 u00a0 u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0地下管道,并且没有 u0442 u0435 u043f u043b u043e u0437 u0430 u0449 u0438 u0442 u043d u043e u0433 u043e屏幕,m ;; dufi- u043f u0440 u0435 u0434 u0435 u043b u044c u043d u0430 u00a0在管道土壤深度为 u043f u0440 u043e u043c u0435 u0440 u0437 u0430 u043d u0438 u00a0 u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0(i-m和管道长度(m), u043a u043e u0442 u043e u0440 u0430 u00a0为 u0432 u0438 u0441 u0438 u043c u043e u0441 u0441 u0442 u044c u044e定义;其中qri- u0440 u0430 u0441 u0447 u0435 u0442 u043d u0430 u00a0电源垂直 u0434 u0430 u0432 u043b u0435 u043d u0438 u00a0土壤路堤, u0434 u0435 u0439 u0441 u0442 u0432 u0443 u0449 u0430 u00a0 1个项目。管道长度(由载荷的可靠度系数(f = 0.9)确定,kn / m ;; qTi-计算得出的重量1 engos。m根管道(给定的基础重量,kn / m),对载荷(f = 0.9 .;单位法向力估算值 u043f u0443 u0447 u0435 u043d u043d u0438 u00a0土壤 u043e u0441 u043d u043e u0432 u0430 u043d u043d u0438 u00a0 bTi- u0440 u0430 u0441 u0447 u0435 u0442 u043d u0430 u00a0宽度(外径)或其基础的鞋底,m; c-工作条件(0.9).; n是(1.1)的比率;; 2.在 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0430 u00a0 u0441 u00a0 u0432 u043e u0434 u043e u043f u0440 u043e u043f u0443 u0441 u043a u043d u043d u0430 u00a0管道1,因此,在计算最大允许 u0434 u0435 u0434 u0434 u043e u0440 u043c u0430 u0446 u0438 u00a0 u043c u043f u0440 u0435 u0434 u0435 u043b u044c u043d u043d u0430 u00a0深度 u043f u0440 u043e u043c u0435 u0440 0043 u 043d u0438 u00a0土 u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0在加热后已达到ufi(m)定义条件的保护屏;其中dufi- u043f u0440 u0435 u0434 u0435 u043b u044c u043d u0430 u00a0(对应于 u043f u0435 u0440 u0435 u043c u0435 u0449 u0435 u043d u0438 u00a0 u0441 u043e u043e 的开头u0440 u0443 u0436 u0435 u043d u0438 u00a0向上)土壤深度 u043f u0440 u043e u043c u0435 u0440 u0437 u0430 u043d u0438 u00a0 u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0在热英亩下(i-m和管道长度m ;; husi是接头变形的重要性( u043f u043e u0434 u043d u00a0 u0442 u0438 u00a0) u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0和大多数操纵元素(链接)在冷的影响下的管道(u043f u0443 u0447 u0435 u043d u043d u0438 u00a0, m ;; moi- u0区域中的加权平均模块 u043f u0443 u0447 u0435 u043d u0438 u00a0(单位比例) 444 u043e u0440 u043c u0438 u0440 u043e u0432 u0430 u043d u0438 u00a0极限变形husi已建立依赖性。,分别为第i个土壤区 u043f u0443 u043d u043d u0438 u00a0模块(单位比例)和厚度(m) u043f u043b u043e u00a0 u043c u0435 u0440 u0437 u0430 u043d u0438 u00a0 u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0具有最大允许变形的管道( u0434 u043d u00a0 u0a u0442 u0435)husi最操纵元素(链接) u0441 u043e u043e u0440 u0443 u0436 u0435 u043d u0438 u00a0。; 3。在 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0430 u00a0 u0441 u00a0 u0432 u043e u0434 u043e u043f u0440 u043e u043f u0443 u0441 u043a u043a u0430 u00a0管道1,因此,对于设备 u0442 u0435 u043f u043b u043e u0437 u0430 u0449 u0438 u0442 u043d u043e u0433 u043e屏幕上的 u0432 u043e u0434 u043e u043f u0440 u043e u043d u0438 u0446 u0430 u0435 u043c u043e u0433 u043e( u0433 u0438 u0434 u0440 u043e u043e u0444 u0438 u043b u044c u043d u0433 u043e)的材料涂有 u0433 u0438 u0434 u0440 u043e u0444 u043e u0431 u043d u044b u043c和 u043e u0441 u0442 u0430 u0432 u043e u043c环氧树脂或封装在 u0433 u0438 u0434 u0440 u043e u0438 u0437 u043e u043b u00a0 u0446 u0438 u043e u043d u043d u043e u043e u0433 u043e材料的外壳中塑料膜; 4。 u043f u043f.1和2中的任何一个上的 u0432 u043e u0434 u043e u043f u0440 u043e u043f u0443 u0441 u043a u043d u0430 u00a0管道, u043e u0442 u043b u0447 u0430 u044e u0449 u0430 u00a0 u0441 u00a0,具体取决于 u043f u043e u043b u043e u0436 u0435 u043d u0438 u00a0设计前 u043f u0440 u043e u043c u0435 u0440 u0437 u0430 u043d u0438 u00a0, u0442 u0435 u043f u043b u043e u0437 u0430 u0449 u0438 u0442 u043d u044b u0439屏幕可以执行连续长度的管道或u0441 u043e u0441 u0442 u043e u00a0 u0449 u0438 u043c两部分,其位置分别位于 u0432 u043e u0434 u043e u043f u0440 u043e u0432 u043e u0434 u00a0 u0449 u0435 u0433 u043e区域 u0441 u043e u043e u0440 u0443 u0436 u0435 u043d u0438 u00a0。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号