首页> 外国专利> process for operating a steam system and steam system

process for operating a steam system and steam system

机译:用于运行蒸汽系统的方法和蒸汽系统

摘要

The procedure for the operating of steam power plant entails producing steam (D) in a boiler (3), passing it through a turbine (5) and condensing it in a condenser (7). The condensate (K) thereby gained is preheated and directed back to the boiler as feed water (S). For the preheating the condensate is divided into a first (K1) and a second (K2) partial flow, the first partial flow is preheated and the second partial flow added to it. The first partial flow is preheated by steam bled (A1,A2) from the turbine. An Independent claim is included for a steam power plant which has a bypass line (17) bypassing the preheating system (15) so that the preheating system is charged only with the first partial condensate flow. The preheating system is connected to the turbine by a steam tapping (19A,19B).
机译:蒸汽发电厂的运行过程包括在锅炉(3)中产生蒸汽(D),使其通过涡轮(5)并在冷凝器(7)中冷凝。由此获得的冷凝水(K)被预热并作为给水(S)被引导回锅炉。为了预热,将冷凝物分为第一部分流(K1)和第二部分流(K2),将第一部分流预热并将第二部分流添加到其中。第一部分流被来自涡轮的蒸汽放气(A1,A2)预热。对于蒸汽发电厂包括独立权利要求,该蒸汽发电厂具有绕过预热系统(15)的旁通管线(17),使得预热系统仅填充有第一部分冷凝水。预热系统通过蒸汽龙头(19A,19B)连接到涡轮。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号