首页> 外国专利> idonea impinging execution of a device with step railway vehicles equipment pile-up prevention (anticlimbers) passable for railway wagons.

idonea impinging execution of a device with step railway vehicles equipment pile-up prevention (anticlimbers) passable for railway wagons.

机译:梯级呼吸道妨碍执行具有可用于铁路货车的阶梯式铁路车辆设备堆积防止(防爬器)的设备。

摘要

Train formation (ZUV) with at least two rail vehicles (WA1, WA2) coupled with each other, between which are provided respective passage devices (UEB) with at least two corrugated bellows (WB1, WB2) that can be joined together and each having several portafuelles (BR1, BR2, BR3, BR4), and wherein the gate means (UEB) further passage plates (UB1, UB2, UB3, UB4) and a support (ABS) for passage plates (UB1, UB2, UB3, UB4), which can slide on a sliding plate (GLP) disposed between railway cars (WA1, WA2) over a coupling device (KUP), being provided in the end regions of railway vehicles (WA1, WA2) coupled with each other at least respective devices pile-up prevention (AC1, AC2), characterized in that devices pile-up prevention (AC1, AC2) extend each over essentially the entire width of the vehicle, the lower edges of being arranged the portafuelles (BR1, BR2 , BR3, BR4) on the top edges of the pile-up prevention devices (AC1, AC2) and the sliding plate (GLP) disposed below the lower edge of the pile-up prevention devices (AC1, AC2).
机译:具有至少两个彼此联接的轨道车辆(WA1,WA2)的列车编队(ZUV),在其之间设置有具有至少两个波纹管(WB1,WB2)的通道装置(UEB),该波纹管可以连接在一起并且每个具有几个门燃料(BR1,BR2,BR3,BR4),其中门装置(UEB)还设有通道板(UB1,UB2,UB3,UB4)和用于通道板的支架(ABS)(UB1,UB2,UB3,UB4)可以在耦合装置(KUP)上方的设置在铁路车(WA1,WA2)之间的滑板(GLP)上滑动,该耦合装置设置在彼此至少耦合的铁路车(WA1,WA2)的端部区域中防止堆积(AC1,AC2),其特征在于,防止堆积(AC1,AC2)的装置基本上在车辆的整个宽度上延伸,布置的下边缘布置有燃料(BR1,BR2,BR3,BR4)。 )放在防堆积装置(AC1,AC2)的上边缘和位于其下边缘下方的滑板(GLP)防堆积装置(AC1,AC2)。

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号