首页> 外国专利> Methodology Using 4D CAD System for Civil Engineering Project by Integration of 3D Object and Schedule

Methodology Using 4D CAD System for Civil Engineering Project by Integration of 3D Object and Schedule

机译:通过将3D对象和进度表集成在一起的用于土木工程项目的4D CAD系统方法

摘要

In the present invention, parts and structures of a facility are constructed in a three-dimensional form in a construction work, and the completion state of each work progress schedule is continuously realized in a three-dimensional shape, thereby visualizing the progress of the process, Dimensional construction work process management system and its implementation method.;For this purpose, the present invention has constructed a method of constructing an automatic terrain triangle capable of visualization by color classification according to design part, and in real-time, The morphing technique was developed and implemented in the system.;In addition, the present invention has developed a visual progress management expression technique that expresses the progress management state of the actual progress schedule with respect to the planned construction schedule in three dimensions with different colors according to the site and structure for the delay and excess schedule, Along with 4D implementation, introduces the function to grasp the problem in advance by virtually showing the actual use state such as simulation running in conjunction with the virtual reality (VR) function.;In addition, the present invention constitutes a wireless communication use function for obtaining 4D construction information in the field. In order to realize a comprehensive 4D implementation of a wide area site, a key map capable of selectively implementing 4D on a screen ranging from a wide- ) Function.;In addition, a key map function that can selectively implement 4D on the screen from the wide area to the detailed structure range is constructed for the comprehensive 4D implementation of the wide area field.;Furthermore, in order to perform these functions completed according to the construction schedule, the present invention is configured such that the construction schedule calculation, the three-dimensional configuration for each object, the 4D implementation, and the virtual reality implementation functions are all performed by the built- Integrated management of my information and implementation of related functions at each level.
机译:在本发明中,在建筑工程中以三维形式构造设施的零件和结构,并且以三维形状连续地实现每个工程进度计划的完成状态,从而可视化处理的进度为此,本发明构造了一种构造地形的自动三角的方法,该三角可以根据设计部分通过颜色分类进行可视化,并且可以实时地进行变形技术。另外,本发明开发了一种可视化进度管理表达技术,该可视化进度管理表达技术根据规划的施工进度,以三种颜色用不同的颜色表示实际进度进度相对于计划的施工进度进度的进度管理状态。延误和超期时间表的站点和结构,以及4D实施方式中,通过虚拟地显示诸如虚拟现实(VR)功能一起运行的模拟之类的实际使用状态来介绍提前解决问题的功能。此外,本发明构成用于获得4D构造的无线通信使用功能。现场信息。为了实现广域站点的全面4D实现,可以在屏幕上从宽范围功能选择性地实现4D的按键图。此外,可以从屏幕上选择性地实现4D的按键图功能。为了广域领域的全面4D实现,构造了从广域到详细结构范围的区域。此外,为了执行根据施工进度表完成的这些功能,本发明被配置为使得施工进度表计算,每个对象的三维配置,4D实现和虚拟现实实现功能都由内置的我的信息集成管理和每个级别的相关功能的实现来执行。

著录项

  • 公开/公告号KR100777373B1

    专利类型

  • 公开/公告日2007-11-19

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20040101024

  • 发明设计人 강인석;지상복;

    申请日2004-12-03

  • 分类号G06F17/50;

  • 国家 KR

  • 入库时间 2022-08-21 19:54:36

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号