首页>
外国专利>
A METHOD OF LAYING PLANS FOR A LOADING SCHEDULE FOR LAYING PLANS FOR A SHIP PRODUCING SCHEDULE
A METHOD OF LAYING PLANS FOR A LOADING SCHEDULE FOR LAYING PLANS FOR A SHIP PRODUCING SCHEDULE
展开▼
机译:船舶生产计划表的布置计划的布置方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method of establishing a system for a loading-schedule plan to make a plan for ship-production schedule is provided to maintain consistency of a ship-ticketing plan and a short and medium term plan by establishing systematic standard and process for production plan establishment; build an organization undertaking the production plan from the integrated view; introduce a tool which can analyze a load by considering all kinds of contract stipulations by industry or occupation; establish a production plan system which can analyze a load by considering all kinds of contract stipulations by industry or occupation; build a process which analyzes capacity before and after facility investment and the capacity variation trend connected to the existing facilities; distribute productions by stage reasonably by fractionating a work management unit(WBS system establishment); build a process reflecting an production output by a type of ship; establish the monitoring system and structure of the production output; make the work standardization system, such as work manual or management protocol; and have modification, additional analysis and feedback process. A method of establishing a system for a loading-schedule plan to make a plan for ship-production schedule follows a procedure for loading network plan. The procedure includes the following steps: a step which generates and inquires the loading network by short and medium term loading information; a step which modifies schedule for loading date by changing the loading network; a step which calculates the CRM(Critical Path Method) if the loading network or the loading date has changed; and a step which examines and decides the loading date by adjusting the loading network.
展开▼