首页>
外国专利>
A METHOD OF LAYING PLANS FOR A MIDDLE SCHEDULED ARRANGEMENT FOR A SHIP PRODUCTION
A METHOD OF LAYING PLANS FOR A MIDDLE SCHEDULED ARRANGEMENT FOR A SHIP PRODUCTION
展开▼
机译:船舶生产中途安排计划的一种方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
It is a kind of to be arranged to maintain the consistency and mid-term plan of a ship-ticketing scheme and a shorts for establishing the method that a kind of system for a medium-term schedule layout drawing is used for ship production, it is established by establishing systematic standard and method for production plan; Tissue is established, agrees to production plan from integrated view; A tool is introduced, by industry or the various contract provisions of consideration is occupied, can analyze a load; A production planning system is established, by industry or the various contract provisions of consideration is occupied, can analyze resistance; A process is established, in equipment investment and is connected to analysis ability before and after the volume change trend of existing equipment; Moderately distributed by one operation control unit (foundation of WBS systems) of fractionation by the stage and is produced; A process is established, the yield of certain ship is reflected through; Establish the structure of operating system and yield; Woprk standardization system is manufactured, such as is worked manually or management agreement; With modification, additional analysis and feedback process. A method of for establishing a kind of system, a medium-term schedule layout drawing is used for for ship production following procedure for a leading embarkation arrangement plan. Program determines the standard and representative shape for block and stores definition in production plan database the following steps are included: a step; One step determines shape, position and the leading limitation in workshop by ship and stores definition in production plan database; One step, by using a rule, quantity that is initial and automatically configuring new leading block by ship, when leading workshop by ship is arranged; One step, the leading block by ship for being manually arranged or being not set on workshop; One step, about the arrangement schedule that the leading block by ship being arranged on marking-off table is adjusted to each workshop; One step, when marking-off table is arranged, one load of analysis is by a marking-off table and passes through work; One step when occupied place has changed, makes occupied active branch during the period of the occupancy of block; One step, execute examination process, move on to next process and complete for leading embarkation arrangement one plan after before, storage plan.
展开▼