首页> 外国专利> A METHOD OF LAYING PLANS FOR A MIDDLE SCHEDULED ARRANGEMENT FOR A SHIP PRODUCTION

A METHOD OF LAYING PLANS FOR A MIDDLE SCHEDULED ARRANGEMENT FOR A SHIP PRODUCTION

机译:船舶生产中途安排计划的一种方法

摘要

It is a kind of to be arranged to maintain the consistency and mid-term plan of a ship-ticketing scheme and a shorts for establishing the method that a kind of system for a medium-term schedule layout drawing is used for ship production, it is established by establishing systematic standard and method for production plan; Tissue is established, agrees to production plan from integrated view; A tool is introduced, by industry or the various contract provisions of consideration is occupied, can analyze a load; A production planning system is established, by industry or the various contract provisions of consideration is occupied, can analyze resistance; A process is established, in equipment investment and is connected to analysis ability before and after the volume change trend of existing equipment; Moderately distributed by one operation control unit (foundation of WBS systems) of fractionation by the stage and is produced; A process is established, the yield of certain ship is reflected through; Establish the structure of operating system and yield; Woprk standardization system is manufactured, such as is worked manually or management agreement; With modification, additional analysis and feedback process. A method of for establishing a kind of system, a medium-term schedule layout drawing is used for for ship production following procedure for a leading embarkation arrangement plan. Program determines the standard and representative shape for block and stores definition in production plan database the following steps are included: a step; One step determines shape, position and the leading limitation in workshop by ship and stores definition in production plan database; One step, by using a rule, quantity that is initial and automatically configuring new leading block by ship, when leading workshop by ship is arranged; One step, the leading block by ship for being manually arranged or being not set on workshop; One step, about the arrangement schedule that the leading block by ship being arranged on marking-off table is adjusted to each workshop; One step, when marking-off table is arranged, one load of analysis is by a marking-off table and passes through work; One step when occupied place has changed, makes occupied active branch during the period of the occupancy of block; One step, execute examination process, move on to next process and complete for leading embarkation arrangement one plan after before, storage plan.
机译:一种维护船舶票务方案的一致性和中期计划的方法,是一种建立一种用于船期生产的中期进度图的系统的方法的简而言之,通过建立系统的生产计划标准和方法来建立;建立组织,从综合角度同意生产计划;引入一种工具,按行业或考虑的各种合同规定来占用,可以分析负荷;建立了生产计划系统,按行业或对各种合同规定的考虑占有,可以分析阻力;在设备投资中建立一个过程,并与现有设备的数量变化趋势前后的分析能力相关;由一个分阶段的操作控制单元(WBS系统的基础)适度分配并产生;建立一个过程,反映出特定船舶的产量;建立操作系统的结构和产量; Woprk标准化系统是制造的,例如手动工作或管理协议;经过修改,附加分析和反馈过程。一种用于建立一种系统的方法,中期进度计划图用于船上生产,遵循领先登船安排计划的程序。程序确定块的标准形状和代表性形状,并将定义存储在生产计划数据库中,包括以下步骤:第一步,通过船来确定车间的形状,位置和主要限制,并将定义存储在生产计划数据库中;第一步,当安排了船队领导车间时,通过使用规则来确定初始数量,并自动配置船队领导新块;第一步,将船首引导块手动布置或不放置在车间;第一步,关于将安排在标记台上的轮船首领调整到每个车间的安排时间表;第一步,当配置了标价台时,分析的一个负载是由标价台来完成。占用位置改变时的一个步骤,在块占用期间使占用活动分支;第一步,执行检查过程,转到下一个过程,并完成一个领先的登机安排,之后是一个计划,存储计划。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号