首页> 外国专利> GUIDED CLINBING SYSTEM FOR SKYSCRAPER CONSTRUCTION

GUIDED CLINBING SYSTEM FOR SKYSCRAPER CONSTRUCTION

机译:摩天大楼建造的引导爬升系统

摘要

A guided climbing system for constructing a skyscraper is provided to improve the workability and save the installation cost by modifying a structure of a conventional guided climbing system. A guided climbing system for constructing a skyscraper comprises a cage, a guide(30) and a dish nut(40). The case includes a working deck(3) and a gang form(2) for curing an outer wall. The guide has both ends fixed between the outer side of a lower end of the gang form and the working deck at the lower end of the cage. The dish nut is coupled with a thread(31) formed in the guide and lifted up and down as the guide is rotated. An anchor(4) is fixed to the upper end of the gang form. A fixing clamp(10) is fixed to the anchor and has a recess(12) through which the guide passes. A detachable clamp(20) is coupled with the fixing clamp and has a long recess(21) communicating with the recess.
机译:提供一种用于建造摩天大楼的导引爬升系统,以通过修改常规导引爬升系统的结构来提高可操作性并节省安装成本。用于建造摩天大楼的引导式爬升系统包括笼,导向器(30)和碟形螺母(40)。箱体包括工作台(3)和用于固化外墙的帮派模板(2)。导向器的两端固定在帮组形式的下端的外侧和笼子下端的工作台之间。碟形螺母与形成在引导件中的螺纹(31)连接,并随着引导件的旋转而向上和向下提升。锚(4)固定在帮组模板的上端。固定夹(10)固定在锚固件上,并具有导向器穿过的凹口(12)。可拆卸的夹具(20)与固定夹具连接,并且具有与凹槽连通的长凹槽(21)。

著录项

  • 公开/公告号KR100862275B1

    专利类型

  • 公开/公告日2008-10-09

    原文格式PDF

  • 申请/专利权人 KUNHA CO. LTD.;KWON JONG GYU;

    申请/专利号KR20070060413

  • 发明设计人 KWON JONG GYU;

    申请日2007-06-20

  • 分类号E04G11/20;E04G11/22;E04G3/20;E04G3/28;

  • 国家 KR

  • 入库时间 2022-08-21 19:51:34

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号