A non-excavation type pipeline installation method using the existing pipeline is provided to minimize the time and cost required for installing a new pipeline by installing a new pipeline by excavating a partial section between manholes, and to minimize the occurrence of dust and noise by having no connection with traffic control by construction. A non-excavation type pipeline installation method using the existing pipeline comprises the steps of excavating the ground as much as the length of one pipe forming the existing pipeline(10) between manholes, removing pipe in the excavated part, cutting out the lower part of the existing pipeline using a cutting device, expanding the existing pipeline using an expansion device, inserting a support member(20) to a cut-out part(11) of the existing pipeline, and inserting a pipe to the inside of the existing pipeline, thereby forming a new pipeline(30).
机译:提供一种使用现有管道的非开挖型管道安装方法,以通过在人孔之间进行局部开挖来安装新管道,从而最大程度地减少安装新管道所需的时间和成本,并通过减少尘土和噪音的产生而将其最小化。与施工的交通管制无关。一种使用现有管道的非开挖式管道安装方法,包括以下步骤:挖出地面,其长度与形成人孔之间的现有管道(10)的一根管道的长度一样,将挖出部分中的管道切除,切下地下部分。使用切割装置对现有管道进行操作,使用扩展装置对现有管道进行扩展,将支撑构件(20)插入现有管道的切除部分(11),并将管道插入现有管道的内部,从而形成新的管道(30)。

著录项

  • 公开/公告号KR20090080848A

    专利类型

  • 公开/公告日2009-07-27

    原文格式PDF

  • 申请/专利权人 DONG YANG SPECIAL CONCRETE CO. LTD.;

    申请/专利号KR20080006839

  • 发明设计人 LEE MYOUNG KWEON;

    申请日2008-01-22

  • 分类号E03F3/06;E03F3;

  • 国家 KR

  • 入库时间 2022-08-21 19:12:52

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号