首页> 外国专利> METHOD FOR ERECTION OF SLAB-PILE FOUNDATION

METHOD FOR ERECTION OF SLAB-PILE FOUNDATION

机译:平板桩基础的架设方法

摘要

FIELD: construction.;SUBSTANCE: method for erection of slab-pile foundation includes arrangement of pile field and foundation slab with conical hollow holes arranged in it. In process of building erection access is provided to conical holes of slab-foundation grill, and as time elapses when slab-foundation grill achieves rated settling, which equals 1/2 of permissible value for this type of buildings, all conical holes are filled with concrete.;EFFECT: increased bearing capacity of foundation, reduced settling.;2 dwg
机译:领域:施工;实体:板桩基础的安装方法包括桩场和基础板上布置有锥形空心孔的布置。在建筑物的安装过程中,通向板基础格栅的锥形孔,并且随着时间的流逝,板基础格栅达到额定沉降(等于此类建筑物的允许值的1/2)时,所有锥形孔都被填充效果:增加地基的承载力,减少沉降; 2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号