首页> 外国专利> optimized abtauregelungsanordnung and procedure for parallel arranged frischluftauslu00e4ssen of air-conditioning

optimized abtauregelungsanordnung and procedure for parallel arranged frischluftauslu00e4ssen of air-conditioning

机译:平行布置的空调的优化的优化方法和程序

摘要

The present invention relates to an arrangement for deicing pipeline connections of an aircraft, which are connected to all fresh air outlets of an air conditioner, whose construction comprises the functions of multiple turbines and heat exchangers, having a first pipeline (1), which is connected to a first turbine (TA), and a second pipeline (2), which is connected to a second turbine (TB), the two pipelines (1, 2), which are each connected downstream from the two turbines (TA, TB) and to which process air is fed at the turbine outlets, being connected at the pipe ends and being continued using a third pipeline (3). The arrangement is characterized in that a first hot air source (11) is fed hot fresh air from a bleed air system of the aircraft and is connected at its outlet to a fourth pipeline (4), into which temperature-reduced fresh air is fed from the hot air source (11). The fourth pipeline (4) is connected at its pipe end to two further valve-regulated pipelines (5,6), of which a fifth or a sixth pipeline (5, 6) is connected to the first or the second pipeline (1, 2), and through which temperature-reduced fresh air is transported and fed valve-regulated to the first and/or second pipeline (1, 2).
机译:用于为飞机的管路连接除冰的装置技术领域本发明涉及一种用于使飞机的管路连接除冰的装置,该管路连接至空调的所有新鲜空气出口,其构造包括多个涡轮机和热交换器的功能,并具有第一管路(1),该管路为连接到第一涡轮机(TA)和连接到第二涡轮机(TB)的第二管道(2),两条管道(1、2)分别连接在两个涡轮机(TA,TB)的下游),然后在涡轮机出口处向过程空气供气,在管道末端将其连接起来,并使用第三条管道(3)继续进行。该装置的特征在于,第一热空气源(11)从飞机的引气系统被供给热的新鲜空气,并且在其出口处连接到第四管道(4),降低了温度的新鲜空气被供给到第四管道(4)。来自热空气源(11)。第四管道(4)在其管道末端连接到另外两个阀控管道(5,6),其中第五或第六管道(5,6)连接到第一或第二管道(1,降低温度的新鲜空气通过第一输送管和/或第二输送管(1,2)输送,并经阀调节后输送。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号