首页> 外国专利> METHOD FOR ESTABLISHING A TOWER FOR A WIND POWER PLANT AND A TOWER FOR A WIND POWER PLANT

METHOD FOR ESTABLISHING A TOWER FOR A WIND POWER PLANT AND A TOWER FOR A WIND POWER PLANT

机译:建立风电厂塔的方法和风电厂塔

摘要

The invention relates to a method for constructing a tower for a wind power installation and to a tower for a wind power installation. In this case, a coating is applied at least partially onto the exterior surface of the tower, wherein the coating is applied such that the coating absorbs tensile stresses which act on the exterior surface of the tower, and that the coating seals the exterior surface of the tower against environmental influences, in particular moisture, which act on the surface from the outside.
机译:本发明涉及一种用于建造用于风能设备的塔架的方法,并且涉及一种用于风能设备的塔架。在这种情况下,将涂层至少部分地施加到塔架的外表面上,其中,施加涂层使得该涂层吸收作用在塔架的外表面上的拉应力,并且该涂层密封塔的外表面。避免环境影响,特别是湿气从外部作用在塔表面上。

著录项

  • 公开/公告号AT12187U2

    专利类型

  • 公开/公告日2011-12-15

    原文格式PDF

  • 申请/专利权人 TIMBER TOWER GMBH;

    申请/专利号AT20110000289U

  • 发明设计人

    申请日2011-05-19

  • 分类号E04H12/02;E04H12/04;F03D11/04;

  • 国家 AT

  • 入库时间 2022-08-21 17:22:00

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号