首页> 外国专利> METHOD FOR ESTABLISHING A TOWER FOR A WIND POWER PLANT AND A TOWER FOR A WIND POWER PLANT

METHOD FOR ESTABLISHING A TOWER FOR A WIND POWER PLANT AND A TOWER FOR A WIND POWER PLANT

机译:建立风电厂塔的方法和风电厂塔

摘要

The invention relates to a method for erecting a tower (31) for a wind turbine (30) and a tower (31) for a wind turbine (30). In this case, a coating (69) is at least partially applied to the outer surface of the tower, wherein the coating is applied so that the coating absorbs tensile loads acting on the outer surface of the tower (31), and that the coating, the outer surface of the tower Tower (31) against externally acting on the surface environmental influences, in particular moisture, seals
机译:本发明涉及一种用于安装用于风力涡轮机(30)的塔架(31)和用于风力涡轮机(30)的塔架(31)的方法。在这种情况下,将涂层(69)至少部分地施加到塔架的外表面,其中,施加涂层以使得该涂层吸收作用在塔架(31)的外表面上的拉伸载荷,并且该涂层,防止塔塔(31)的外表面受外部环境的影响,特别是湿气对表面的影响

著录项

  • 公开/公告号AT12187U3

    专利类型

  • 公开/公告日2012-09-15

    原文格式PDF

  • 申请/专利权人 TIMBER TOWER GMBH;

    申请/专利号AT20110000289U

  • 发明设计人

    申请日2011-05-19

  • 分类号E04H12/04;F03D11/04;

  • 国家 AT

  • 入库时间 2022-08-21 17:22:00

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号