首页> 外国专利> Power-generating plant powering up method, involves selecting net connection point of time, so that power curve of start mode is equalized, and carrying out selected mode or start mode for durations of delay time

Power-generating plant powering up method, involves selecting net connection point of time, so that power curve of start mode is equalized, and carrying out selected mode or start mode for durations of delay time

机译:发电厂加电方法,包括选择网络连接的时间点,以使启动模式的功率曲线均匀,并在延迟时间内执行选择的模式或启动模式

摘要

The method involves setting a target time point (tz) in which a desired power value (Pz) for installation is achieved. One of start modes (M1, M2, M2') is selected, and a time period between a start time (ts) and the target time point is determined. A maximum allowable delay time for the start mode is calculated. A net connecting point of time (T1) is selected, so that a power curve of the start mode is equalized based on a subsequent net connecting point of time. The selected mode or the start mode is carried out for durations of delay time (deltat). An independent claim is also included for a control device for starting up a power-generating system.
机译:该方法包括设置目标时间点(tz),在该目标时间点中实现安装的期望功率值(Pz)。选择启动模式之一(M1,M2,M2'),并确定起始时间(ts)和目标时间点之间的时间段。计算启动模式的最大允许延迟时间。选择净连接时间点(T1),以便基于随后的净连接时间点使启动模式的功率曲线相等。所选模式或启动模式会持续一段时间(延迟时间)。还包括用于启动发电系统的控制装置的独立权利要求。

著录项

  • 公开/公告号DE102010038645A1

    专利类型

  • 公开/公告日2012-02-02

    原文格式PDF

  • 申请/专利权人 SIEMENS AKTIENGESELLSCHAFT;

    申请/专利号DE20101038645

  • 发明设计人 EBNER GUENTHER;HERZOG TOBIAS;

    申请日2010-07-29

  • 分类号F02C9/28;

  • 国家 DE

  • 入库时间 2022-08-21 17:05:23

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号