首页> 外国专利> Operational manner null of the compressed porous membrane boiler system and the generation of electricity system and the compressed porous membrane boiler system which possess this

Operational manner null of the compressed porous membrane boiler system and the generation of electricity system and the compressed porous membrane boiler system which possess this

机译:具有该功能的压缩多孔膜锅炉系统的运行方式以及电力系统和压缩多孔膜锅炉系统的运行

摘要

PROBLEM TO BE SOLVED: To provide a pressurized fluidized bed boiler system maintaining the height of a fluidized bed inside a furnace, a power generation system equipped with the pressurized fluidized bed boiler system and an operating method of the pressurized fluidized bed boiler system.;SOLUTION: The pressurized fluidized bed boiler system is provided with a pressurized fluidized bed boiler 20 in which the height of a bed material 61 forming the fluidized bed 60 is increased/decreased based on a ratio (L/C) of limestone to coal in fuel comprising coal, limestone and water and the bed material 61 can be extracted from a furnace bottom; a fuel supply means 40 manufacturing the fuel and supplying the fuel to the pressurized fluidized bed boiler 20; and a calculating means measuring measurement displacement of the height of the bed material 61 of the pressurized fluidized bed boiler 20 per unit time, calculating increase/decrease amount of the bed material 61 after predetermined time passes based on the measurement displacement, and calculating the L/C so that predicted increase/decrease amount which is a difference between the calculated increase/decrease amount and extract amount of the bed material 61 extracted from the pressurized fluidized bed boiler 20 becomes a predetermined value or less.;COPYRIGHT: (C)2009,JPO&INPIT
机译:要解决的问题:提供一种维持炉内流化床高度的加压流化床锅炉系统,配备有加压流化床锅炉系统的发电系统以及该加压流化床锅炉系统的操作方法。 :加压流化床锅炉系统设置有加压流化床锅炉20,其中基于包括以下成分的燃料中的石灰石与煤的比率(L / C),增加/减少形成流化床60的床材料61的高度。煤,石灰石和水以及床材料61可从炉底提取。燃料供应装置40制造燃料并将燃料供应给加压流化床锅炉20。计算装置测量加压流化床锅炉20的床材料61的单位时间的高度的测量位移,基于该测量位移计算经过预定时间后的床材料61的增减量,并计算L / C,以使预测的增减量为预定值以下,该预测增减量是计算的增减量与从加压流化床锅炉20中提取的床材料61的提取量之间的差。 ,JPO&INPIT

著录项

  • 公开/公告号JP5072440B2

    专利类型

  • 公开/公告日2012-11-14

    原文格式PDF

  • 申请/专利权人 中国電力株式会社;

    申请/专利号JP20070144718

  • 发明设计人 栗原 英雄;

    申请日2007-05-31

  • 分类号F23C10/30;

  • 国家 JP

  • 入库时间 2022-08-21 16:56:13

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号