首页> 外国专利> METHOD OF CONTROLLING A COMBINED - CYCLE PLANT FOR PRODUCTION OF ELECTRIC ENERGY AND COMBINED -CYCLE PLANT FOR PRODUCTION OF ELECTRIC ENERGY

METHOD OF CONTROLLING A COMBINED - CYCLE PLANT FOR PRODUCTION OF ELECTRIC ENERGY AND COMBINED -CYCLE PLANT FOR PRODUCTION OF ELECTRIC ENERGY

机译:控制电力生产的联合循环工厂和电力生产的联合工厂的方法

摘要

A method of controlling a combined-cycle plant for production of electric energy, comprising at least one gas turbine assembly (2) and a steam turbine (5) with respective generators (3) and (6). A provisional load set- point (SPTV*) for the steam turbine (5) is determined on the basis of the plant load set-point (SP0) and an actual steam pressure (PA) supplied to the steam. turbine (5). A gas turbine load set-point (SPTG) is thus determined on the basis 'of the plant load set-point (SP0) and the provisional load set-point (SPTV*) and is used to control the gas turbine assembly (2). A steam turbine load set- point (SPTV), indicative of a second power (WTV) to be supplied through the steam turbine (5), is finally determined on the basis of the provisional load set- point (SPTV*) and of a load error (ETG) of the gas turbine assembly (2) and is used to control the steam turbine (5).
机译:一种控制用于发电的联合循环设备的方法,该方法包括至少一个燃气轮机组件(2)和带有相应发电机(3)和(6)的蒸汽轮机(5)。汽轮机(5)的临时负荷设定点(SP TV *)是根据工厂负荷设定点(SP 0 )和一个提供给蒸汽的实际蒸汽压力(P A )。涡轮(5)。因此,基于“工厂负荷设定点(SP 0 )和临时负荷设定点来确定燃气轮机负荷设定点(SP TG ) (SP TV *)并用于控制燃气轮机组件(2)。最终确定汽轮机负荷设定点(SP TV ),该设定点指示将通过汽轮机(5)供给的第二功率(W TV )。燃气轮机组件(2)的临时负载设定值(SP TV *)和负载误差(E TG )的基础,用于控制蒸汽轮机(5)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号