首页> 外文期刊>Thermal engineering >Methodology for Consideration of Specific Features of Combined-Cycle Plants with the Optimal Sharing of the Thermal and the Electric Loads at Combined Heat Power Plants with Equipment of a Complex Configuration
【24h】

Methodology for Consideration of Specific Features of Combined-Cycle Plants with the Optimal Sharing of the Thermal and the Electric Loads at Combined Heat Power Plants with Equipment of a Complex Configuration

机译:考虑复杂结构设备的联合火力发电厂热电负荷最优分配的联合循环发电厂特殊特征的考虑方法

获取原文
获取原文并翻译 | 示例
           

摘要

When a combined-cycle power plant operates as part of a combined heat power plant, the optimal load-sharing among the power-generating units of the station is complicated owing to specific features of operating a combined-cycle power plant, viz., the dependence of its adjustment range values on the outdoor air temperature, degradation of the ecological and economic performance figures under underloading conditions, possibility of load-sharing between the gas turbines, and a high flexibility. A method for optimal sharing of the load among the power-generating plants of combined heat power plants is proposed that takes into consideration the above features of the combined-cycle power plants. The combined heat power plant is divided into "equivalent" units according to the group power supply points. The first step is the intra-unit optimization over the entire variation range of the thermal and electric loads to achieve the best energy performance of the "equivalent" unit. The second step is the optimization of the load-sharing among the "equivalent" units.
机译:当联合循环发电厂作为联合热电厂的一部分运行时,由于运行联合循环发电厂的特定功能,即电站的发电单元之间的最佳负载分担变得很复杂。其调节范围值对室外空气温度的依赖性,在欠载条件下生态和经济性能指标的下降,燃气轮机之间的负载分担可能性以及高度的灵活性。考虑到联合循环发电厂的上述特征,提出了一种在联合热电厂的发电厂之间最佳分配负荷的方法。根据组供电点,将组合式热电厂分为“等效”单位。第一步是在热负荷和电负荷的整个变化范围内进行单元内部优化,以实现“等效”单元的最佳能源性能。第二步是优化“等效”单元之间的负载共享。

著录项

  • 来源
    《Thermal engineering》 |2015年第5期|335-340|共6页
  • 作者单位

    Moscow Power Engineering Institute National Research University, ul. Krasnokazarmennaya 14, Moscow, 111250 Russia;

    Moscow Power Engineering Institute National Research University, ul. Krasnokazarmennaya 14, Moscow, 111250 Russia;

    Moscow Power Engineering Institute National Research University, ul. Krasnokazarmennaya 14, Moscow, 111250 Russia;

    Moscow Power Engineering Institute National Research University, ul. Krasnokazarmennaya 14, Moscow, 111250 Russia;

    Moscow Power Engineering Institute National Research University, ul. Krasnokazarmennaya 14, Moscow, 111250 Russia;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    optimal control; load-sharing; adjustment range; combined-cycle power plant; combined heat power plant;

    机译:最佳控制;负载分担;调整范围;联合循环发电厂;联合热电厂;