首页> 外国专利> Track structure for direct connecting with concrete-filled steel pipe, and constructing method for the same

Track structure for direct connecting with concrete-filled steel pipe, and constructing method for the same

机译:直接连接钢管混凝土的轨道结构及其施工方法

摘要

PURPOSE: A track structure with a concrete-filled steel pipe and a construction method thereof are provided to control track irregularity by directly installing a rail fastener on a concrete-filled steel pipe. CONSTITUTION: A track structure(100) using a concrete-filled steel pipe comprises two rails(110), steel pipes(120), spacers(130), rail fasteners(140), base plates(150), fixing studs(160), and fill concrete. The rails guide the wheels of a train. The steel pipes are installed on the bottoms of the rails and support the load of the train. The spacers are welded between the steel pipes to maintain the gap between the rails. The rail fasteners elastically fasten the rails to the tops of the steel pipes. The base plates are attached to the surfaces of the steel pipes and fix the rail fasteners to the steel pipes. The fixing studs fix the base plates to the top surfaces of the steel pipes. The fill concrete is filled in the steel pipes to reduce vibration.
机译:目的:提供一种具有钢管混凝土的轨道结构及其施工方法,以通过将导轨紧固件直接安装在钢管混凝土上来控制轨道不规则性。组成:使用混凝土钢管的轨道结构(100),包括两个轨道(110),钢管(120),垫片(130),轨道紧固件(140),基板(150),固定螺柱(160) ,然后填充混凝土。导轨引导火车的车轮。钢管安装在铁轨的底部并支撑火车的负载。间隔件焊接在钢管之间,以保持导轨之间的间隙。导轨紧固件将导轨弹性固定到钢管的顶部。基板被附接到钢管的表面并且将导轨紧固件固定到钢管。固定螺柱将基板固定到钢管的顶面。填充混凝土填充在钢管中以减少振动。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号