首页> 外国专利> STATOR OF THREE-PHASE SYNCHRONOUS HYDRAULIC TURBINE GENERATOR WITH POLE-CHANGING WINDING

STATOR OF THREE-PHASE SYNCHRONOUS HYDRAULIC TURBINE GENERATOR WITH POLE-CHANGING WINDING

机译:变极绕组三相同步水轮发电机定子

摘要

The invention relates to heavy electric machine industry. A stator of three-phase synchronous hydraulic turbine generator having a pole-changing winding is meant for two mode operating cycles with different rotation frequency. First temporary operating cycle is with initial storage of minimal level (hydraulic drop) of water in upper pool of a dam of hydroelectric station. It starts while initial filling of minimal level of water reservoir with temporary low rotation frequency () with temporary quantity of polesand reduced power. Second, permanent operating cycle is with full (specified) storage calculated level (hydraulic drop) of water in the upper pool of a dam. It starts at a stage of electric station hydraulic units with regularly high specified rotation frequency () with steady quantity of polesof high power. According to the invention, an embodiment providing change of hydraulic turbine generator rotation frequency is realized. Herein, change of number of poles thereof and simultaneously substitution of rotor poles is performed. For this, the stator having pole-changing winding is used. Herein, the winding is modified from implementation with certain number of poles to another number of poles by resoldering (replacement) only interpole connections of the stator winding (between pole-phase groups of rods). The proposed design provides for increase of technical-and-economic indexes with low cost and time reduction for manufacturing hydraulic turbine generator stator. Due to replacement (resoldering) the bridges between polar-phase arias (groups) of rods only the complete replacement of the stator winding is not required.
机译:本发明涉及重型电机工业。具有变极绕组的三相同步水轮发电机的定子用于具有不同旋转频率的两种模式的工作循环。第一个临时运行周期是在水电站大坝的上水池中初始存储最低水位(水位)。它在初始填充最低水位时开始,该水位具有暂时的低旋转频率(),具有暂时的极数和降低的功率。其次,永久运行周期是指大坝上部水池中的全部(指定)存储计算水位(液压降)。它开始于电站液压单元的阶段,该阶段的液压单元通常具有较高的指定旋转频率()和稳定的高功率极数。根据本发明,实现了提供改变水力涡轮发电机旋转频率的实施例。在此,改变其极数并同时替换转子极。为此,使用具有变极绕组的定子。在此,通过仅重新焊接(替换)定子绕组的极间连接(在杆的极相组之间),将绕组从具有一定数量的极的实施方式修改为另一数量的极。提出的设计以低成本和减少制造水轮机发电机定子的时间提供了增加的技术和经济指标。由于更换(重新焊接)杆的极相曲线(组)之间的电桥,因此不需要完全更换定子绕组。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号