首页> 外国专利> METHOD OF VENTILATION OF EXTRACTION DISTRICT IN REVERSE ORDER OF MINING

METHOD OF VENTILATION OF EXTRACTION DISTRICT IN REVERSE ORDER OF MINING

机译:开采逆序开采区通风方法

摘要

FIELD: mining.;SUBSTANCE: method is carried out by means of preventing air leakage through the timely mounting and dismounting the ventilation jumper behind the working chambers, depending on the values of the thermal depressions. The method comprises implementation of the preliminary calculation of the minimum and maximum thermal depressions he min and he max, respectively, arising between the gate road and ventilation connections, and also between the gate road and embedded conveyor air gates as functions of the minimum he min=f(ΔHmin) and the maximum he min=f(ΔHmin) of values of the differences of the elevation points between the place of mining of working chambers and the place of air outlet from the gate road in the slope ΔHmin and ΔHmax. And the values ΔH are calculated based on the length of the extraction district, the number of pairs of exhaust chambers, the length of the exhaust area behind the ventilation connections, the width of the exhaust chambers, the width of the stope and the angle of dip. At that in the process of increasing the number of exhaust chambers and when achievement of the value of thermal depression equal to he min the jumper is dismantled, and when achievement of the value of thermal depression equal to he max, the jumper is mounted again.;EFFECT: improvement of efficiency of ventilation.;2 dwg
机译:领域:采矿;方法:通过根据热压的值及时安装和拆卸工作室后面的通风跳线来防止漏气的方法。该方法包括实施对分别在闸道和通风连接之间产生的最小和最大热压降h e min 和h e max 的初步计算,以及最小h e min = f(ΔH min )和最大h e min 的函数关系在斜率ΔH min 中,工作室的开采地点与出入口的出风口之间的高程点差的值的= f(ΔH min 和ΔH max 。 ΔH的值是根据提取区域的长度,排气室对的数量,通风连接后面的排气区域的长度,排气室的宽度,采场的宽度和蘸。在增加排气室数量的过程中,当达到热阻值等于h e min 时,将跳线拆除,而当达到热阻值等于h时 e max ,则再次安装跳线。效果:提高通风效率。2dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号