首页>
外国专利>
INDICATING STATUS, DUE DATE, AND URGENCY FOR A LISTED TASK BY A TASK TRACKING CONTROL
INDICATING STATUS, DUE DATE, AND URGENCY FOR A LISTED TASK BY A TASK TRACKING CONTROL
展开▼
机译:通过任务跟踪控制指示已列出任务的状态,到期日和紧急程度
展开▼
页面导航
摘要
著录项
相似文献
摘要
Disclosed herein are representative embodiments of tools and techniques for displaying one or more task tracking controls to indicate respective progress statuses, urgency stages, and due dates for respective of one or more listed tasks of a procedure. According to one exemplary technique, a task list is received by a software. The task list including a listed task. In addition, a determination is made that the listed task is in an incomplete status. Also, an urgency stage is determined for the listed task. The listed task is associated with a due date for the listed task. Based on the determination that the listed task is in an incomplete status, a task tracking control is output for display. The task tracking control indicating the incomplete status of the listed task includes a visual indication of the due date and a visual indication of the urgency stage for the listed task.
展开▼