首页> 外国专利> METHOD FOR OPTIMIZING SCHEDULE COMPRESSION IN PROJECTS USING ACCELERATING AND OVERLAPPING OF ACTIVITIES

METHOD FOR OPTIMIZING SCHEDULE COMPRESSION IN PROJECTS USING ACCELERATING AND OVERLAPPING OF ACTIVITIES

机译:通过加速和重叠活动优化项目中的计划压缩的方法

摘要

This innovation is in the field of project management and project controlssystems for usein compressing projects schedules. Compressing project schedule requiresadditional cost formore resources, when activities are accelerated, or to cover the resultedrework when activitiesare overlapped. This causes schedule compression costlier than normalexecution. However,there are benefits associated with schedule compression as well. This createsa trade-off betweencosts and benefits of schedule compression. Performing this trade-off in realindustrial projects isvery time consuming due to the large number of possible solutions. Aninnovative algorithm andcomputer tool is designed and developed to provide optimum degree ofaccelerating andoverlapping of activities in projects. The developed algorithm provides thebest or close to thebest schedule compression strategy that offers maximum benefit and minimumduration inprojects. The algorithm and computer tool are developed using evolutionaryoptimizationtechniques to optimize the solutions.
机译:此创新属于项目管理和项目控制领域使用系统在压缩项目进度表中。压缩项目进度要求的额外费用当活动加速或覆盖结果时增加资源活动时返工重叠。这导致时间表压缩比正常情况下花费更高执行。然而,时间表压缩也有好处。这创造了两者之间的权衡进度压缩的成本和收益。实际执行此折衷工业项目是由于存在大量可能的解决方案,因此非常耗时。一个创新算法和设计和开发计算机工具以提供最佳程度的加速和项目中活动的重叠。开发的算法提供了最好或接近提供最大收益和最小收益的最佳计划压缩策略持续时间项目。使用进化算法开发算法和计算机工具优化优化解决方案的技术。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号