METHOD FOR OPTIMIZING SCHEDULE COMPRESSION IN PROJECTS USING ACCELERATING AND OVERLAPPING OF ACTIVITIES

机译:利用活动的加速和重叠来优化项目中的计划压缩的方法

摘要

This innovation is in the field of project management and project controls systems for use in compressing projects schedules. Compressing project schedule requires additional cost for more resources, when activities are accelerated, or to cover the resulted rework when activities are overlapped. This causes schedule compression costlier than normal execution. However, there are benefits associated with schedule compression as well. This creates a trade-off between costs and benefits of schedule compression. Performing this trade-off in real industrial projects is very time consuming due to the large number of possible solutions. An innovative algorithm and computer tool is designed and developed to provide optimum degree of accelerating and overlapping of activities in projects. The developed algorithm provides the best or close to the best schedule compression strategy that offers maximum benefit and minimum duration in projects. The algorithm and computer tool are developed using evolutionary optimization techniques to optimize the solutions.
机译:此创新属于项目管理和项目控制系统领域,可用于压缩项目进度表。压缩项目进度计划需要额外的成本,以便在加速活动时获得更多资源,或者在活动重叠时弥补所产生的返工。这将导致计划压缩比正常执行更为昂贵。但是,时间表压缩也有好处。这在计划压缩的成本和收益之间产生了一个折衷。由于存在大量可能的解决方案,因此在实际的工业项目中进行这种折衷非常耗时。设计和开发了一种创新的算法和计算机工具,以提供最佳程度的项目加速和重叠活动。开发的算法可提供最佳或接近最佳的进度压缩策略,从而在项目中提供最大的收益和最小的持续时间。使用进化优化技术开发算法和计算机工具以优化解决方案。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号