首页> 外国专利> METHOD OF PUTTING INTO OPERATION OF PRODUCTIVE RESERVOIRS IN WELLS AT THE LATE STAGE OF DEVELOPMENT

METHOD OF PUTTING INTO OPERATION OF PRODUCTIVE RESERVOIRS IN WELLS AT THE LATE STAGE OF DEVELOPMENT

机译:在开发的后期将井中的生产储层投入运营的方法

摘要

FIELD: oil and gas industry.SUBSTANCE: invention relates to oil-extracting industry, to facilities of non-damaging drilling of a productive interval of formation and inducing oil inflow from it. The method of putting into operation of productive formations at a late stage of development contains drilling of productive formations by drilling perforation and creation of differential pressure drawdown. During drilling of formations by a drilling perforator with high drill penetration into rock the drill passing through metal of the casing string, cement stone and rock is monitored by the value of registered load on the driving mechanism of drill extension. The process of increase of load on the driving mechanism of drill extension at its penetration through the colmataged zone deep into the rock by no less than 250-300 mm and the moment of sharp decrease of the named load after passing the colmataged zone of rock after registration of which at once the pressure drop is initiated in the casing string below the hydrostatic level no less than by 0.5 MPa.EFFECT: increase of level of oil recovery of newly drilled productive formations is provided.2 dwg
机译:石油开采技术领域本发明涉及石油开采业,涉及一种非破坏性的钻探,该钻探具有生产地层的间隔并诱导石油从其中流入。在开发后期使生产层投入运行的方法包括通过钻孔打孔生产生产层并产生压差下降。在钻探穿孔器钻探地层的过程中,钻探具有很高的钻入深度,钻入套管柱金属,水泥石和岩石中的钻头通过钻头延伸机构上的登记载荷值进行监控。钻进延伸装置的驱动机构穿过岩层深部的钻进区时,其载荷增加的过程不小于250-300 mm,经过岩体的岩层区后,所称载荷急剧减小的过程在压力低于静压水平不低于0.5 MPa的套管柱中立即开始压降的记录,效果:提供了新钻探生产地层的采油量增加2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号