首页> 外国专利> METHOD FOR COMMISSIONING productive reservoirs in wells at later stages of development

METHOD FOR COMMISSIONING productive reservoirs in wells at later stages of development

机译:在开发后期调试井中生产油藏的方法

摘要

Input method for use productive formations in a late stage of development wells containing tailing-boring perforations and creating drawdown, characterized in that during the opening of seams drill perforator with an increased yield of the drill into the rock monitor the passage of a drill through metal casing column cement stone and rock largest recorded load on the drive mechanism extension drill, thus increasing the process load register on the drive mechanism extension drill during its passage zakolmatirovannoy zone deeper rock least 250-300 mm and the moment of abrupt reduction of said load after passing zakolmatirovannoy rock zone immediately after registering which produce pressure drop in the casing below the hydrostatic level of not less than 0, 5 MPa.
机译:在开发井的后期使用生产性地层的输入方法,该方法包含尾随钻孔和压井,其特征在于,在接缝打开期间,随着钻具进入岩石的产量增加,钻具穿孔器会监控钻具穿过金属的通道套管柱水泥石和岩石在驱动机构延伸钻上记录的最大载荷,从而在其通过zakolmatirovannoy区更深的岩石过程中增加了驱动机构延伸钻上的过程载荷记录,最小为250-300 mm,并且在该载荷突然减小之后记录后立即通过zakolmatirovannoy岩石区,在套管中产生的压降低于静水压不低于0、5 MPa。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号