A method and device for switching an operation mode of a five-level inverter are provided. The method includes: determining a first three-level operation mode as a three-level operation mode to be switched to from a five-level operation mode in a case that a PV input voltage is higher than a bridge line-line voltage command value; switching, after the operation mode is switched to the first three-level operation mode, the operation mode from the first three-level operation mode to a second three-level operation mode, in a case that a junction temperature of a switching device operating in the first three-level operation mode exceeds a first preset value; and switching the operation mode from the second three-level operation mode to the first three-level operation mode in a case that the junction temperature of a switching device operating in the second three-level operation mode exceeds a second preset value.
展开▼