首页> 外国专利> Project management system with non-functional evaluation, project management method by non-functional evaluation, and project management program by non-functional evaluation

Project management system with non-functional evaluation, project management method by non-functional evaluation, and project management program by non-functional evaluation

机译:具有非功能性评估的项目管理系统,非功能性评估的项目管理方法以及非功能性评估的项目管理程序

摘要

Provided is a progress management technique for a project, the technique also covering a non-functional requirement of the project. A parameter required for evaluating the non-functional requirement is adjusted according to the progress of the project, and calculation is made, using the adjusted parameter, on to which extent the non-functional requirement may finally differ from a target value.
机译:提供了一种用于项目的进度管理技术,该技术还涵盖了该项目的非功能性需求。根据项目进度调整评估非功能性需求所需的参数,并使用调整后的参数进行计算,在该范围内,非功能性需求最终可能与目标值有所不同。

著录项

  • 公开/公告号JP6213552B2

    专利类型

  • 公开/公告日2017-10-18

    原文格式PDF

  • 申请/专利权人 日本電気株式会社;

    申请/专利号JP20150500094

  • 发明设计人 榊 啓;

    申请日2013-11-19

  • 分类号G06F9/44;G06F11/36;G06Q10/06;

  • 国家 JP

  • 入库时间 2022-08-21 13:58:00

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号