首页> 外国专利> How to construct a dam corridor

How to construct a dam corridor

机译:如何修建水坝走廊

摘要

PROBLEM TO BE SOLVED To provide a technique for further improving the filling property of concrete to the lower side of the bottom surface of a corridor cell.SOLUTION: A corridor cell of the dam corridor on the cut-off wall concrete of the front lift is provided with a mount for placing a stand for placing a precast corridor cell having a plurality of holes on the bottom surface thereof A step of installing a corridor cell on which the corridor cell is placed on the gantry, a space under the bottom surface of the corridor cell placed on the gantry, a circumference below the bottom surface of the corridor cell, And a step of placing concrete around the corridor cell to embed the corridor cell, wherein in the step of setting the concrete, while confirming the filling condition from the plurality of holes, Place the concrete in the gap below the bottom of the corridor cell.(FIG.
机译:解决的问题是提供一种进一步改善混凝土在走廊小室底面下侧的填充性能的技术。解决方案:前电梯的防渗墙混凝土上的水坝走廊的走廊小室是设置有用于放置支架的支架,该支架用于在其底表面上放置具有多个孔的预制走廊单元。将走廊单元安装在机架上的步骤是将走廊单元放置在机架上,该走廊单元的底面下方是空间。放置在龙门架上的走廊单元,在走廊单元的底面下方的圆周,以及在走廊单元周围放置混凝土以嵌入走廊单元的步骤,其中在凝固混凝土的步骤中,从多个孔,将混凝土放置在走廊单元底部下方的间隙中。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号