首页> 外国专利> DEVICE FOR PRECISION INSTALLATION OF PANELS SUBJECTED TO FOUR POINTS OF BRIDGE STRUCTURAL STRUCTURES

DEVICE FOR PRECISION INSTALLATION OF PANELS SUBJECTED TO FOUR POINTS OF BRIDGE STRUCTURAL STRUCTURES

机译:桥梁结构四点面板的精密安装装置

摘要

The technical solution relates to the construction and reconstruction of span structures of bridge structures. The technical result is an increase in the accuracy of the installation of the bridge span structure during its erection or reconstruction. This is achieved by the fact that the device for precise mounting of the bridge span structures suspended for four points includes a mechanism for their vertical displacement in the form of an even number of packages equipped with devices for controlling the opening and closing of the upper and lower double-acting hydraulic jacks associated with the individual for each of them by an electrohydraulic station with a control system for vertical movement and the state of collet anchors Depending on the pressure in each of the jacks, the deviation from the projected position of each of the four attachment points of the span structure, the time and speed of the lift, the upper collet anchor for the steel seven-wire ropes attached directly to the hollow piston of each double-action hydraulic jack, and the lower anchor grip for fixing the ropes in the reverse stroke of the piston in the fixed housing of the jack, while half of the steel seven-wire ropes connected to the collet anchors of each hydraulic jack, and the left whistle, and the other half - the right one.
机译:该技术方案涉及桥梁结构跨度结构的施工与改造。技术结果是在桥梁跨度结构的安装或重建过程中提高了安装精度。这是由于以下事实而实现的:用于精确地悬挂四点悬挂的桥跨结构的装置包括用于其垂直位移的机构,该机构以偶数个包装的形式安装有用于控制上部和下部开口的装置。下部双作用液压千斤顶通过电动液压站与每个人相关联,该电动液压站带有用于垂直运动和筒夹锚定状态的控制系统,具体取决于每个千斤顶中的压力,与每个千斤顶的投影位置之间的偏差跨距结构的四个连接点,举升的时间和速度,直接连接到每个双动液压千斤顶的空心活塞上的钢七钢丝绳的上夹头锚和用于固定千斤顶的固定壳体中的活塞反向冲程中的绳索,而一半的钢制七线钢丝绳则连接到每个液压千斤顶,左哨,另一半-右哨。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号